SPONSORED EDITORIAL
5 STAY SAFE AND BE SEEN IN SNICKERS’ HIGH-VIS PROTECTIVE WORKWEAR
Long working days and cheap uncomfortable clothing makes Snickers Workwear’s protective wear range the better-informed choice for anyone working in hazardous environments and inclement weather. There’s a comprehensive selection of ergonomically designed base, mid and top layer clothes, certified as appropriate for different risks at work to ensure comfort, health and workforce- wellbeing all day, every day. Te new range also includes
waterproof and windproof AllroundWork high-vis jackets that provide protection in low-light, high-risk environments. So, whatever the hazard
on site, the Snickers Workwear High-Vis collection and the
Furlough and collective redundancies: the clock is ticking!
By Eleanor Mannion Senior Associate, MacRoberts LLP
ProtecWork range can provide a protective wear solution to provide maximum, certified protection, whatever the risks are on site. To find out more about our
products, call 01484 854788, download a catalogue at www.
snickersworkwear.co.uk or email
sales@hultaforsgroup.co.uk
5 CHOOSE FLEXIBLE COMFORT WITH SNICKERS’ 4-WAY STRETCH TROUSERS
Snickers’ new 4-Way Stretch Trousers deliver extreme comfort, all day, every day. High-tech fabrics and body- mapping designs ensure maximum working mobility. With great fit and superb
value, the trousers have a tailored fit for better looks and protection against snagging as well as reinforced stretch Cordura in the KneeGuard System for greater flexibility, comfort and durability.
Tey’re designed to take the new D30 ERGO Craftsman Kneepad. Check out all the stretch
garments from Snickers Workwear – the optimal choice for craftsmen and women who need to get every job done comfortably and efficiently on site. For more information, call 01484 854788, go to www.
snickersworkwear.co.uk or email
sales@hultaforsgroup.co.uk
With the UK Government’s Coronavirus Job Retention Scheme (CJRS) due to end on 31 October 2020, businesses relying on the scheme to pay wages may now have to consider making redundancies. It is important that
employers start to consider the timing of any collective redundancy process. If the employer is proposing
to dismiss 20 or more employees in a 90-day period, they will need to collectively consult with representatives of those employees for at least 30 days before the first of the dismissals takes effect. Tis means that if you intend to make 20 to 99 employees redundant in time for the closure of the CJRS, you need to have started the collective consultation process by Tursday 1 October. If the employer is proposing
to dismiss more than 100 employees in a 90-day period, they will need to collectively
No. of employees at risk
20+ 100+
Minimum consultation period (before first dismissal)
30 days 45 days
consult with representatives of those employees for at least 45 days before the first of the dismissals takes effect. Tis means that if you
intend to make more than 100 employees redundant, in time for the closure of the CJRS, you will need to have started the collective consultation process by Tuesday 15 September 2020. Te collective consultation period begins with a formal letter to the representatives setting out specific information
to comply with the consultation legislation, such
as the numbers of
employees affected, the potential pools and the selection criteria. If you have questions about
the redundancy process or the closure of the CJRS, please get in touch with our Employment Team.
●To find out more, call 0141 303 1109 or email eleanor.
mannion@macroberts.com
Last date to have started collective consultations in time for the end of CJRS
Tursday 1 October 2020
Tuesday 15 September 2020
CABLEtalk OCTOBER/NOVEMBER 2020 45
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48