search.noResults

search.searching

dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
Industry News


Valmet to supply a waste-to-energy boiler to Lidkцping Energi in Sweden


V


almet will supply a waste-fired steam boiler to Lidkцping Energi AB in Lidkцping, Sweden.


With the new boiler, the company will be able to convert 130,000 tons of waste per year into district heat, industrial hot water, industrial steam and electricity, while also ensuring an environmentally safe disposal of harmful residues. The order is included in Valmet’s


orders received of the first quarter 2020. The value of an order of this size and delivery scope is typically above EUR 10 million. The new boiler is scheduled to start up in 2021. “We are very proud of the


improvements we will make. We will be more cost-efficient, produce more energy and, most importantly, improve our environmental


footprint. Our environmental standards are already among the very best in the world, but now, we will take another step forward. We have good experiences of Valmet’s technology, but still for this investment, we followed a strict evaluation process to make sure that we got the best solution we could find,” says Stina Bergenheim, CEO at Lidkцping Energi. The new boiler from Valmet will


replace two 35-year-old boilers, and Lidkцping Energi will also take other steps to increase the recovery of energy from the fuel. When all upgrades are in place, the annual production of electricity can be doubled. Increased electricity production in Lidkцping will lower global greenhouse gas emissions from electricity production based on


fossil fuels. “The boiler from Valmet


represents proven technology that meets the EU’s Industrial Emissions Directive requirements by a wide margin. I am excited about the project and look forward to realizing it together with Lidkцping Energi,” says Anders Victoren, Sales and Project Manager at Valmet. Valmet will supply the entire boiler unit with auxiliary equipment, such as fuel and ash systems. The delivery includes erection, commissioning, training and start-up. The boiler will have a thermal


capacity of 20 MW and will be based on Valmet’s bubbling fluidized bed (BFB) technology with Advanced Combustion Zone (ACZ™) for highly efficient low-emission control. The boiler will be able to run on a very


Valmet will supply a waste-fired steam boiler to Lidkцping Energi AB in Lidkцping, Sweden.


wide fuel mix, including industrial waste, refuse-derived fuel (RDF), biomass and municipal waste. There are currently 20 ACZ boilers in operation, running on a wide range of waste fuels. The latest design changes have further improved the high service friendliness and corrosion resistance of this technology. VALMET Corporate Communications For further information, please contact: Anders Victoren, Sales and Project Manager, EMEA, Valmet, tel. +46 703 700950 www.valmet.com


Spring 2020 Forest Bioenergy Review 7


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24