Technical Paper


Figure 8: Drying and firing of S.R.U.


lining(s) an auxiliary heating equipment was necessary to cover the lower temperature period, e.g. from ambient to approx. 350 - 400 °C, where the main burners should take over and realize the remainder of the required heating schedule. Unfortunate the maximum temperature allowed in the central air ducts was only 250 °C.


In such a way the objective to have an even heat distribution and to reach all corners could be met. (appendix 1). Temperatures of the hot gases were measured on a number of locations, but at least at the entrance and outlet of each equipment. The result showed clearly the 'delay' of the temperatures in succeeding equipment.


It showed also that drying and firing has to be continued until all 'critical' CALL FOR PAPERS


INSTITUTE OF REFRACTORIES ENGINEERS ANNUAL CONFERENCE 2018


THE WITCHES CAULDRON


WEDNESDAY 14TH NOVEMBER VENUE: TANKERSLEY MANOR, CHURCH LANE, TANKERSLEY, BARNSLEY, SOUTH YORKSHIRE S75 3DQ


The art of finding a refractory solution to the challenging environment of Waste to Energy units.


Waste incineration plants are becoming more popular in the UK and many new units are being erected throughout the country. New technologies of handling the waste and ensuring the energy is captured in the most effective ways have become available.


Appendix 1:


Anyone with experience in the field of selecting refractory materials and design of these units are welcome to present a paper on the day.


May 2018 Issue ENGINEER THE REFRACTORIES 15


Figure 9: Drying and firing of a furnace section


refractory linings have reached the required firing temperature. Although the given schedule does not show that fact, it means that considerable time is required to heat up 'remote' parts, such as convection banks, lined ducts and the stack itself as well.


Drying and firing with auxiliary burner equipment is the preferred method of such an initial procedure. Although gas-fired burners have generally a large turn-down ratio, and larger than oil-fired burners, still they are not enough for the start-up and first part, say up to 600 °C, of common procedures. So they require 'assistance' by a separate equipment.


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32