SAFETY & SECURITY Decoding fire regs


Rob Gunningham of SE Controls discusses regulations, compliance and best practice for fire safety


F


ire safety is more than ever a prominent issue within the construction industry, as a result of the high-profile failures associated with Grenfell Tower. While certain remedial measures are being addressed, there is a lack of clear guidance when it comes to regulations and compliance for smoke control systems, from specification and design through to installation and post-occupancy maintenance regimes.


Regulatory network


Smoke control systems are among the most highly regulated aspects of a building’s design. From our experience of running regular CPD events for architects and specifiers, it is often apparent that regulations need interpreting and ‘decoding’ to help best practice emerge through a greater level of understanding. Under the UK Construction Product Regulations, products that have a harmonised European standard (hEN), must be CE certified against that standard.


The following EN 12101 series of harmonised standards apply to smoke ventilation products: • EN12101 Part 1 Specification for smoke barriers


• EN12101 Part 2 Natural smoke and heat exhaust ventilators


• EN12101 Part 3 Specification for powered smoke and heat exhaust ventilators


• EN12101 Part 8 Smoke control dampers • EN12101 Part 10 Power supplies.


Windows automated for smoke ventilation fall into the smoke and heat exhaust ventilator (SHEV) standard EN12101-2.


EN 12101-2 dictates that actuators and vent profiles must be tested together as a single system, at an accredited facility, to all annexes of the prescriptive standard. There are also strict audited procedures to fabricate and install the components, to ensure they are manufactured as tested. Failure to follow this procedure means that


ADF OCTOBER 2018


the required Declaration of Performance (DoP) certificate cannot be issued, therefore the solution is not compliant.


Compliance & diligence in design In addition to component regulations, the most important design and specification reference is Building Regulations Approved Document B (ADB). This not only provides all the necessary guidance on escape travel distances and smoke control options, but also gives details on the location of vents, free area calculations and other key considerations, yet it must be remembered that ADB is a guidance document and shows minimum compliance standards for fire safety in occupied buildings. However, unless the specifier is fully conversant with every aspect of ADB, there is potential for the specifications to be misinterpreted. For example, Section 2.26 requires smoke vents to be located either on an external wall or discharge into a vertical smoke shaft, yet each option also has additional specification criteria which have an impact on the building design. When located on an external wall the smoke vent’s minimum free area to enable smoke to escape is 1.5 m2


. However, as the


free area is dependent on the window size and the amount it opens, this has a direct influence on window sizing. Also, the free area requirement calculations must be undertaken in accordance with ADB Appendix C – ‘Methods of measurement’, or alternatively the aerodynamic free area can be declared, which satisfies BS EN12101-2:2003 for natural ventilators. ADB also demands that a smoke shaft opening at roof level must be at least 0.5 m above any surrounding structures within a horizontal distance of 2.0 m and extend at least 2.5 m above the ceiling of the highest storey served by the shaft. This has clear implications for the building design, such lift shaft over-runs and parapet walls, which affects the location of smoke shafts and the location of roof mounted plant. The key point for specifiers to take from these examples is that there are


91


APPROVED DOCUMENT B CALCULATION Example free area calculation: • Where A = 1.0 m and B = 1.0 m, the maximum free area = 1.0 m2


.


• If the vent opens to 30° (0.5 m) then free area = A x 0.5 = 0.5 m2


.


• When the vent opens to 60° then the free area = the area of rectangle A x B = 1 m x 1 m = maximum free area = 1.0 m2


WWW.ARCHITECTSDATAFILE.CO.UK


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100