search.noResults

search.searching

note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
INDUSTRY NEWS


MOTIVE OFFSHORE GROUP COMPLETES SPECIALIST PROJECT FOR MAJOR OFFSHORE SUBSEA COMPANY


A leading North-east offshore services firm has completed a £1.5m project to design and fabricate equipment for a major offshore subsea company.


Motive Offshore Group, which is headquartered in Boyndie near Banff,produced a loading tower for SwanHunter earlier this year.


The loading tower is the first of its kind designed, fabricated and operated by Motive and has been tailor-made to meet specific project requirements, including an under-bender chute and height extension sections.


Complete with a new-build 10Te Tensioner, the system is capable of handling flexible products up to 550mm outer diameter.


Motive Offshore Group has a skilled workforce of 80 employees across its marine equipment manufacture and rental and fabrication divisions.


Operated by Motive technicians, the equipment is currently being used to deploy flexible pipe in Offshore Ghana. The tower is aboard the Lewek Constellation sited around 60km from the coast.


This is the first time that Motive has designed and built equipment like this and we are extremely pleased with the end result.


We have diversified our services over the years to enable us to meet the requirements of our clients, which allows us to construct high quality equipment like this. Our skilled team work hard to ensure we continue to build on our reputation for producing a high standard of goods.


James Gregg, Director, Motive Offshore Group.


In co-operation with Swan Hunter, Motive Offshore have designed, fabricated and operated key items of Swan Hunter equipment including; 15Te horizontal tensioner, 10Te vertical tensioner, 450Te Reel Drive System and 5000Te Carousel Loading Tower.


All items delivered have been robustly built to a high quality specification. As required, the Motive team worked flexibly to achieve demanding delivery schedules.


On site, Motive personnel have been diligent and professional when operating equipment to safely deliver the project.


John young, Project Engineer, Swan Hunter (NE) Limited.


www.motive-offshore.com


November 2017 | www.sosmagazine.biz | p11


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52