Page 53 of 56
Previous Page     Next Page        Smaller fonts | Larger fonts     Go back to the flash version

Specifiers’ pages

TO SHOWCASE YOUR PRODUCTS ON THESE PAGES, CONTACT TOMPEARDON ON T: +44 (0)20 7490 5595 E: tom@atompublishing.co.uk

INSTANT BROADBAND

Why suffer months of costly delays waiting for ADSL providers?

Use MultiCom – for rapid construction site broadband connectivity. Adopted by many major construction companies for ‘first-in’ Communications

• Immediate communications for new site cabins/offices • Ready to provide many users with access to the internet • No long term commitment, 1 month minimum rental • Demonstration available at a location of your choice ‘MultiCom is the best ‘first-in’

communications service available’ (Tier 1 Construction Company. 2014)

Tel: 01708 774420 Email: sales@tardis.uk.com

TIME & ATTENDANCE MANAGEMENT SYSTEM (TAMS) FOR CONSTRUCTION SITES

...talking to many Construction Site Managers, they have stressed how important it is to accurately monitor staff attendance on-site, whether it be for health and safety or to prevent ghosting (false attendance).

• Finger & Facial Biometric Recognition with photographic evidence capability.

• Management can monitor all remote sites centrally from HQ.

• Promotes efficient project management and doubles-up as a Health & Safety record. • Limitless employee capacity –

no number too small, or too high.

• Handles various types of shifts (i.e. standard; complex; split shifts; night shifts)

• No capital outlay, minimum 1 month rental

• No fixed line or ADSL connection necessary

“This solution is so cost-effective, it has saved the company thousands [of pounds] in lost wages through ghosting” - (Contractor on behalf of a Tier 1 Construction Company, 2014)

Tel: 01708 774420 Email: sales@tardis.uk.com LEVOLUX MINDS THE GAPS

The new northern entrance to London’s Blackfriars Station boasts an external Solar Shading solution, from Levolux. The solution comprises 30 bays of 140mm wide, white Aerofoil Fins. Fins are concentrated in west- facing bays, to limit solar heat gain and are faceted to follow the curvature of the building which turns to face north. T 020 8863 9111 E info@levolux.com W www.levolux.com

SAFETY AND SUSTAINABILITY TAKE OFF FOR CROWN PAINTS AT HEATHROW

Safety and sustainability helped Crown Paints play a part in a major multi-billion pound project at Heathrow Airport. The manufacturer was chosen to supply its flame-retardant paint, Crown Trade Timonox, for use in the new Terminal 2B at Heathrow Airport. Representing a £2bn

investment, Terminal 2B is the largest airside project Heathrow Airport has ever undertaken. The specification was

supported by Crown Paints’ pioneering carbon footprint reporting service, used throughout the project. Heathrow’s Terminal 2B has been constructed by Balfour Beatty and

sets a benchmark in sustainability as the world’s first Building Research Establishment Environmental Assessment Method (BREEAM) certified airport terminal. Balfour Beatty consulted with suppliers, including Crown Paints, to ensure complete sustainability throughout the project, something which was aided by Crown Paints’ carbon footprint reporting process. www.crownpaintspec.co.uk

CONSTRUCTION MANAGER | JANUARY 2015 | 53

Previous arrowPrevious Page     Next PageNext arrow        Smaller fonts | Larger fonts     Go back to the flash version
1  |  2  |  3  |  4  |  5  |  6  |  7  |  8  |  9  |  10  |  11  |  12  |  13  |  14  |  15  |  16  |  17  |  18  |  19  |  20  |  21  |  22  |  23  |  24  |  25  |  26  |  27  |  28  |  29  |  30  |  31  |  32  |  33  |  34  |  35  |  36  |  37  |  38  |  39  |  40  |  41  |  42  |  43  |  44  |  45  |  46  |  47  |  48  |  49  |  50  |  51  |  52  |  53  |  54  |  55  |  56