This book includes a plain text version that is designed for high accessibility. To use this version please follow this link.
Specifiers’ pages


TO SHOWCASE YOUR PRODUCTS ON THESE PAGES, CONTACT TOMPEARDON ON T: +44 (0)20 7490 5595 E: tom@atompublishing.co.uk


INSTANT BROADBAND


Why suffer months of costly delays waiting for ADSL providers?


Use MultiCom – for rapid construction site broadband connectivity. Adopted by many major construction companies for ‘first-in’ Communications


• Immediate communications for new site cabins/offices • Ready to provide many users with access to the internet • No long term commitment, 1 month minimum rental • Demonstration available at a location of your choice ‘MultiCom is the best ‘first-in’


communications service available’ (Tier 1 Construction Company. 2014)


Tel: 01708 774420 Email: sales@tardis.uk.com


TIME & ATTENDANCE MANAGEMENT SYSTEM (TAMS) FOR CONSTRUCTION SITES


...talking to many Construction Site Managers, they have stressed how important it is to accurately monitor staff attendance on-site, whether it be for health and safety or to prevent ghosting (false attendance).


• Finger & Facial Biometric Recognition with photographic evidence capability.


• Management can monitor all remote sites centrally from HQ.


• Promotes efficient project management and doubles-up as a Health & Safety record. • Limitless employee capacity –


no number too small, or too high.


• Handles various types of shifts (i.e. standard; complex; split shifts; night shifts)


• No capital outlay, minimum 1 month rental


• No fixed line or ADSL connection necessary


“This solution is so cost-effective, it has saved the company thousands [of pounds] in lost wages through ghosting” - (Contractor on behalf of a Tier 1 Construction Company, 2014)


Tel: 01708 774420 Email: sales@tardis.uk.com LEVOLUX MINDS THE GAPS


The new northern entrance to London’s Blackfriars Station boasts an external Solar Shading solution, from Levolux. The solution comprises 30 bays of 140mm wide, white Aerofoil Fins. Fins are concentrated in west- facing bays, to limit solar heat gain and are faceted to follow the curvature of the building which turns to face north. T 020 8863 9111 E info@levolux.com W www.levolux.com


SAFETY AND SUSTAINABILITY TAKE OFF FOR CROWN PAINTS AT HEATHROW


Safety and sustainability helped Crown Paints play a part in a major multi-billion pound project at Heathrow Airport. The manufacturer was chosen to supply its flame-retardant paint, Crown Trade Timonox, for use in the new Terminal 2B at Heathrow Airport. Representing a £2bn


investment, Terminal 2B is the largest airside project Heathrow Airport has ever undertaken. The specification was


supported by Crown Paints’ pioneering carbon footprint reporting service, used throughout the project. Heathrow’s Terminal 2B has been constructed by Balfour Beatty and


sets a benchmark in sustainability as the world’s first Building Research Establishment Environmental Assessment Method (BREEAM) certified airport terminal. Balfour Beatty consulted with suppliers, including Crown Paints, to ensure complete sustainability throughout the project, something which was aided by Crown Paints’ carbon footprint reporting process. www.crownpaintspec.co.uk


CONSTRUCTION MANAGER | JANUARY 2015 | 53


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56