search.noResults

search.searching

dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
;


;;


;;


;;


;


www.heatingandventilating.net Fromthe editor T


swing so thank you to those who have he HVR Awards process is now in full


news is that due to high demand we have extended the deadline to A gust 16u I ou arf y


.


diarise the date. This will be your entries,make sure to e l working on stil


the final deadline to allow


10th anniversary event on place in time for the special the judging process to take


HVR AWARDS - DEADLINE EXTE Oct


Submitting an entry couldn’t easier. Simply tober 24 at the Tower Hotel in London.


S


For thosewho need somemore time, the good managed to get their entries in so far. r.


ww for


head to the dedicated Awards website ww.hvrawards.com


you need about the event and all the a


m. Here you can also find out all the details and complete the online


be it a product, project, initative c tegories available to enter –


• There’s a mixed bag in this or servic e.


month’s issue of HVR with the focus eve y sprnl


combined heat and p ead


‘IT WILL BE HYDROGE THAT MAKES THE DIFFERE


Energy Association Ross Anderson, at the body’s This was the message from director of the ICOM appliances.


C


all proposals aimed at minimising the use of fossil zero carbon emissions target, Mr Anderson said With reference to the Government’s 2050 net annual members’ event last month.


Strategy (BEIS) with its £25million Hy4heat project. Department for Business, Energy and Industrial grid to transport hydrogen was backed by the He said a move to repurpose the national gas fuels deserved scrutiny.


gas fired plant on hydrogen, and ICOM is intricately the industry has the technology to safely operate The investment is aimed at demonstrating that


involved in the project.


In fact, Mr Anderson said, all members will soon be able to bid for funds through the project, to help


been urged to bid for funds to help with the ommercial heating manufacturers have


development process of hydrogen


EN AT ENCE’


positive and look at how we can best dev “Time is of the essence but we have to with the development of hydrogen applia


appliances using renewable fuels. “We are seeing the developmnent and


availability of biopropane, synthetic natural gas and biogases including biomethane together with bio-oil and these will all add to the r


e bers


ting eed


reduction ther


hydrogen to ensure a successful gas hea bring about a succesful outcome as we need embrace the Hy4heat project and do their best to difference. It is very important that member “But it will be hydrogen that makes the of greenhouse gases.


industry.”


ICOM is playing a major role in several projects currently underway seeking to prove that transporting and utilising hydrogen is saf usable. These include Hy4heat, HyDeploy the hydrogen and natural gas network) HyNet Hy10


HyNet, 00 and H21.


y (blending fe and t


nces.


elop green be


ower,


between R with the


and fan coils.


Welcome


residential HVAC, filters and air clea


NDED aining


Spolight on HVAC We a


piece of legislation that has c A standout featu Fujitsu on pg 12.


(MCPD) has implic The Medium Com in the last six mon


humidification aining,


also shine the


ure (pg10) revolves around a specialist


nths with very little fanfare. n that has come into effect


mbustion Plant Directive cations for both new and


existing boilers and our feature reveals all. Heather Ramsden, Editor


Cuttin heat &


L r best to


gas-fired, high new range of w ochinvar has intr


gas-fired condensing r NOx emissions fr


ng edge & vent


introduced a


a low level of NOx emissions. condensing boilers


that produce h efficiency wall-hung,


missions.


high quality stainless steel heat The new products in


exchanger, supported by a new ‘Five plus Five’ extended w


ncorporate a ss steel heat


nded warranty. rom the company’s new EFB


available on the UKmarket. As a result, all EFB produced by a commercial wall hung boiler g ,


24mg/kWh, which is one of the lo


s one of the lowest lev ng range are lower than


els


awarded for air quality on BREEAM-rated projects. models qualify for the maximum two credits


charge in the first five years of operating life in the heat exchanger, which will be replaced free of The new ‘Five plus Five’ warranty covers the


warrantymoves onto a sliding scale where 60 per event of a manufacturer’s fault. Thereafter, the


the sixth year, 40 per cent in years seven and eight, cent of the cost of replacement will be covered in


so on down to 20 per cent in the ninth and tenth. Heather Ramsden, Editor


Let’s cool the p


planet


Introducing KAPPA   


 





PA SKY


      Designed to exceed EcoDesign requiremen ts,





   


  


   


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44