increase would equate to an annual saving of £986.05 – or £14.790.81 over a 15-year life time.
Collaboration and support
provide exemplar designs that could prove especially useful their effectiveness. Added to which, they will often be able to as they not only know their products but how to maximise manufacturers’ or suppliers’ specialist kno wledge early on On more complex designs, it can be beneficial to tap into the
R emeha’s team worked with Thomas Armstrong on multi-component heating designs.
support at ev ery stage,” said Thomas Armstrong’s Stephen CHP technology and have provided valuable advice and “The Remeha team are extremely knowledgeable about throughout the project at Penrith Leisure Centre.
system at Penrith Leisure Centre has been operating non- This collaborative approach has paid dividends as the CHP installation, they were there to offer help and back up.” Clarkson. “At the initial design stage and during the
P
“The Remeha R-Gen CHP produces 44kW of heat per hour stop since it was commissioned by Remeha.
r
Stephen. “It’s heating the constant temperature circuit, and it’s using it all, even in the summer months,” said
providing hot water for shower facilities and, of course, feeding radiators, fan convectors, air handling units,
heating the two swimming pools.” Maintenance
Last but not least, it is advisable to consider at the early stages how the CHP will be managed and maintained.
managed and maintained early stages how the CHP wil It is advisable to consider at the
ll be the
increase boiler efficiency by temperature by just 10°C wo Even lowering the return wat
around 4.5%
uld ter
Combined heat & power ow
the outset to ensure that the CHP operates continuously implementing a long-term Remeha service plan from Thomas Armstrong identified the financial benefits of
and at optimum performance. “A CHP
A CHP unit is a specialist piec it is a specialist piec
identify any wear and tear and r multiple moving parts “Servicing the CHP al there was a service pro not only sized correctly added. “For us, it was i
mportant to install a unit that was cialist piece of plant,” Stephen
f l t ” St h
y for maximum run time, but that ogramme offered.
allows the engineer to monitor the and electrical components, tear and react quickly to any
issues,” he continued. “That way, the CHP continues to produce electricity and heat to the building.
d heat to the building.”
Commercial be CHP has proved a strate
enefits
electricity at lower gas pric will result from the abil total primary energy sa Penrith Leisure Centre.
this will increase the co and electricity prices pr approximately a quarte
avings, further financial savings Aside from the like-for-like 35% egically successful investment at
prices. With gas prices currently at lity of CHP to generate on-site
ost savings for the Council and GLL. redicted to rise faster than gas, er of the cost of electricity costs,
compelling single opportunities to r offer one of the most signific demonstrates, for man As the Penrith Leisu
ny organisations, CHP continues to re Centre installation
collaborating with good supplier to design, installation and maintenanc and NOx emissions. An
benefits can be reaped d.
nd by adopting a holistic approach ortunities to reduce energy costs ignificant and financially-
d suppliers, the maximum and maintenance and
YOUR ALL IN ONE
SOLUTION By b
to a w rang
e, you can expect our us wider Combined Heat an ringing our design and en
of performance and reliability unrivalled expertise and servi
Offering such a broad range of CHP, alo
All the ENG e more reason to choose Re
m
0118 978 3434 GINEERING EFFICIENCY
d u
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44