EQUIPMENT HIRE


Understanding where and why equipment is used is essential. 2. Record and share critical information. Audit fi ndings should be documented alongside electrical and utility requirements. Information must be accessible to multiple people, with hard copies on site and additional copies stored off -site, as systems or personnel may be unavailable during a crisis. 3. Put a Plan B in place. With risks identifi ed, manufacturers can work with a supplier to agree on what contingency equipment is required and how it will be deployed. Availability is key, so support must be available around the clock. 4. Complete remedial works in advance. Temporary equipment requires suitable connections. Simple preparatory works, such as installing pipework or power supplies, can dramatically reduce response time during an emergency. 5. Plan access and equipment location. Temporary chillers or heaters need space and clear access. Whether equipment is positioned in a plant room, yard or car park, access routes and positioning should be agreed and recorded in advance. A clear activation process helps manufacturers


respond quickly to system failures and minimise the risk of unplanned downtime. Engaging a specialist provider such as ICS Cool Energy enables rapid


access to temporary heating and cooling equipment, supported by technical expertise and emergency response.


ICS Cool Energy provides process temperature


control solutions for hire, sale and service, alongside emergency support available 24/7, 365. Temporary heating and cooling equipment can be deployed to support operations when permanent systems fail or are unavailable. ■A typical activation process includes:


■Identify the issue and assess production impact ■Notify engineering, facilities and operations teams ■Contact your contingency partner ■Mobilise temporary heating or cooling equipment ■Install and commission safely ■ Maintain production while permanent repairs are completed


■ Follow clear activation steps to remove uncertain- ty and help engineering teams act quickly and confi dently.


Clivet hp inset ACR Mar26.indd 1


26/2/26 08:46


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36