BOILERS & HOT WATER
that the appliance is commissioned by their own engineers. The warranty on Remeha boilers is a case in point as it increases from two years to an industry-leading seven-year warranty when commissioned by our own engineers.
Yet as we have concluded, skimping on commissioning is a false economy. The larger the boiler, the greater the need for thorough commissioning to avoid additional energy consumption and costs in the short and longer term from incorrect installation. And the more complex the system, the more important commissioning – and a good control strategy – becomes to ensure that the technologies work optimally and in harmony.
So how to ensure that commissioning is carried out meticulously so that the client’s needs and expectations are met? A practical solution is to include manufacturer- led commissioning within the specification. This would then transfer to the tender document and so make it more likely that a rigorous commissioning procedure takes place.
Manufacturer commissioning brings peace of mind that a product will deliver optimum performance from Day One and long after its installation. After all, no-one knows a product as well as its manufacturer. Involving manufacturer commissioning specialists earlier in the project will also ensure that easy access to the equipment is included in the design, helping to speed up the process and minimise disruption or delays for building operators.
Manufacturerled benefits
Specifying manufacturer-led commissioning can additionally unlock major benefits for building owners and occupants. For example, some heating manufacturers offer an extended boiler warranty on condition
On-site staff can take the opportunity to record the initial settings that the manufacturer specifies and note any tips for maximising operational efficiency. Many manufacturers will be able to offer product training on best practice maintenance, if required, to maintain high whole life efficiencies. This level of information and support will help avoid unnecessary increases in energy consumption, emission levels and maintenance costs and will prolong the lifespan of the boiler. At the end of the day, manufacturers as much as building services engineers want to ensure that their equipment does what it says on the tin and support businesses in achieving their environmental targets.
Supporting climate goals
The efficiency of heating and hot water services in commercial buildings is under greater scrutiny as we work towards our net zero emissions target. As we strive to drive down heat-associated emissions, we must actively ensure that new heating equipment and the overall system perform as intended to avoid unnecessary energy waste.
The commissioning process provides certainty that the specification is met while providing businesses with the assurance of safety and maximum efficiency for energy
BSEE
savings and emissions reduction. Specifying manufacturer commissioning is one way of helping ensure that this vital procedure is carried out scrupulously. It is also an excellent way for building owners and operators to access enhanced warranties, set the boiler controls so that the system works efficiently from the outset, and benefit from guidance on future maintenance.
By working together to ensure that the boilers – and the heating system as a whole – perform as designed, we can help close any performance gap and support businesses in achieving their environmental goals.
https://www.remeha.co.uk/customer- support/commissioning
SMART T
TTANK TA
The UK’s e
s experts insexp ex tank-in-tank hot water TOGETHER
Total plant room solut ons b ACV UK and Ideal Hea ing
acv Read the latest at:
www.bsee.co.uk v..com/g /gb gb EXCELLENCE IN HOT WATER BUILDING SERVICES & ENVIRONMENTAL ENGINEER SEPTEMBER 2021 25
Total plant room solutions by ACV UK and Ideal Heating
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50