Technical Feature Part 1 in a Technical series on layng clay pipe, by Hepworth Clay.


Laying vitrified clay pipes


There is no standard procedure when it comes to laying vitrified pipe as the requirements of each installation – from passing through or under existing structures to varying soil conditions – create a number of unique challenges that need to be overcome. In the first of a four-part series with Drain Trader, Paul Wydell Product Manager, Hepworth Clayware, guides installers through the preparations and processes required for successful vitrified clay pipe laying. This month we focus on laying vitrified clay pipes in soft and waterlogged ground.


Laying pipes in soft ground


Where trench formation has little bearing strength and won’t support pipe bedding material effectively, it’s necessary to provide a stable formation before pipe laying. Such conditions usually occur in peat, silty ground, soft clays, running sand, or in artificially-filled ground. Although trench formations are sometimes stabilised with concrete, it’s unlikely to guarantee long-term stability, so a flexible bedding construction is the preferred method.


The trench and manhole base should be over- excavated up to 600-800mm, depending on the bearing strength of the ground. Small particle sized hardcore of less than 75mm is then compacted in layers to form a firm trench bottom. A 50mm layer of lean-mix concrete is then placed as a blinding layer and the pipe is then laid on 150mm bed of granular material above the blinding layer.


The extra depth of granular bedding material of 150mm for sleeve-jointed pipes (rather than the usual 50mm in good ground) is required because of the hard and inflexible nature of the constructed trench bottom using lean mix concrete.


The pipe bedding construction requirements are calculated in the normal way by using the Clay Pipe Development Association (CPDA’s) Bedding


Class F bedding construction in soft ground


Tables or Simplified tables of external loads on buried pipelines. It’s important that ‘wide trench’ design criteria are used, because ‘narrow trench’ conditions can’t be guaranteed in this situation, because of the practicalities that trench walls of soft ground may continue to fall into the trench making it wider or irregular in profile than originally designed thereby increasing the loads locally on the pipeline.


Dependent upon the final traffic and fill loads various bedding configurations providing increasing levels of support can be used to optimise the cost of the installation, a class ‘F’ bedding, has granular bedding material placed under the pipe and selected excavated backfill material placed around and up to 150mm above the pipe and compacted before the main trench backfill is placed. A class ‘B’ granular bedding extends half way up the pipe to the springing points, then excavated material placed above, or a class ‘S’ full granular surround


12 drain TRADER | December 2016 | www.draintraderltd.com


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76