OPEN_796_EAONE_LANDSCAPE_SPECIFICATION 10 Aug 2016 APPENDIX 9
750 PLANTING MAINTENANCE GENERALLY • Weed control: Maintain weed free area around each tree and shrub. - Diameter (minimum): The larger of 1 m or the surface of original planting pit. - Keep planting beds clear of weeds: By use of approved non-residual herbicides.
• Planted areas: Fork over beds as necessary to keep soil loose, with gentle cambers and no hollows. Take care not to reduce depth or effect of mulch.
• Precautions: Ensure that trees and shrubs are not damaged by use of mowers, nylon filament rotary cutters and similar powered tools.
• Staking: Check condition of stakes, ties, guys and guards. - Broken or missing items: Replace. - Rubbing: Prevent. - Ties: Adjust to accommodate growth. - Damage to bark: Cut back neatly with sharp knife. Prevent further damage. - Frequency of checks: At each scheduled maintenance visit.
• Firming up: Gently firm loosened soil around trees/ shrubs. Straighten leaning trees/ shrubs.
• Trees: Spray crown when in leaf during warm weather. - Timing: After dusk.
• Watering: When instructed.
760 PLANTING MAINTENANCE - PRUNING • General: Prune to promote healthy growth and natural shape. - Dead, dying, diseased wood and suckers: Remove. - Timing: As appropriate to the species. - Trees: Favour a single central leading shoot. • Arisings: Remove.
770 WOODLAND PLANTING MAINTENANCE • Watering: Only as necessary to prevent plants wilting. • Loose plants: Refirm surrounding soil, without compacting. • Weed control: Cut down and remove weeds prior to setting seed in a 1 m diameter area around each tree.
• Vegetation except trees and coppice shoots to be retained: Cut within the plantation area. - Height (maximum): 50 mm. - Arisings: Leave between rows.
• Mechanical, chemical or mulching methods of vegetation control: Submit proposals. • Ditches and drains: Keep clear. • Watering: When instructed.
780 MAINTENANCE INSTRUCTIONS • General: Before end of the maintenance period, submit printed instructions recommending procedures to be established by the Employer for maintenance of the planting work for one full year: Provide a schedule of any ongoing maintenance problems experienced during the rectification period.
Page 39 of 54
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84 |
Page 85 |
Page 86 |
Page 87 |
Page 88 |
Page 89 |
Page 90 |
Page 91 |
Page 92 |
Page 93 |
Page 94 |
Page 95 |
Page 96 |
Page 97 |
Page 98 |
Page 99 |
Page 100 |
Page 101 |
Page 102 |
Page 103 |
Page 104 |
Page 105 |
Page 106 |
Page 107 |
Page 108 |
Page 109 |
Page 110 |
Page 111 |
Page 112