OPEN_796_EAONE_LANDSCAPE_SPECIFICATION 10 Aug 2016 APPENDIX 9


685 SURPLUS MATERIALS TO BE REMOVED • Topsoil: Remove from site excess topsoil. • Subsoil, stones, debris, wrapping material, canes, ties, temporary labelling, rubbish, prunings and other arisings: Remove.


690 TOPSOIL STORAGE HEAPS • Location: Throughout the site. • Height (maximum): 2.0 m. • Width (maximum): 5.0 m. - Formation: Loose tip and shape from the side only, without running machinery on the heap at any time.


• Protection: - Do not place any other material on top of storage heaps. - Do not allow construction plant to pass over storage heaps. - Prevent compaction and contamination, by fencing and covering as appropriate.


700 GRADING OF TOPSOIL • Topsoil condition: Reasonably dry and workable. • Contours: Smooth and flowing, with falls for adequate drainage. - Hollows and ridges: Not permitted.


• Finished levels after settlement: 25 mm above adjoining paving, kerbs, manholes etc. • Give notice: If required levels cannot be achieved by movement of existing soil.


705 HANDLING TOPSOIL • Aggressive weeds: Give notice and obtain instructions before moving topsoil. • Plant: Select and use plant to minimize disturbance, trafficking and compaction. • Contamination: Do not mix topsoil with: - Subsoil, stone, hardcore, rubbish or material from demolition work. - Other grades of topsoil.


• Multiple handling: Keep to a minimum. Use or stockpile topsoil immediately after stripping. • Wet conditions: Handle topsoil in the driest condition possible. Do not handle during or after heavy rainfall or when it is wetter than the plastic limit less 3%, to BS 1377-2.


710 SPREADING TOPSOIL • Temporary roads/ surfacing: Remove before spreading topsoil. • Layers: - Depth (maximum): 150 mm. - Gently firm each layer before spreading the next.


• Depths after firming and settlement (minimum): 450 mm. • Crumb structure: Do not compact topsoil. Preserve a friable texture of separate visible crumbs wherever possible.


715 LOOSE TIPPING OF TOPSOIL • General: Do not firm, consolidate or compact topsoil when laying. Tip and grade to approximate levels in one operation with minimum of trafficking by plant.


Page 23 of 54


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112