OPEN_796_EAONE_LANDSCAPE_SPECIFICATION 10 Aug 2016 APPENDIX 9
720 SETTING POSTS IN CONCRETE • Standard: To BS 8500-2. • Mix: Designated concrete not less than GEN1 or Standard prescribed concrete not less than ST2.
• Alternative mix for small quantities: 50 kg Portland cement to 150 kg fine aggregate to 250 kg 20 mm nominal maximum size coarse aggregate, medium workability.
• Admixtures: Do not use. • Holes: Excavate neatly and with vertical sides. • Filling: Position post/ strut and fill hole with concrete to not less than the specified depth, well rammed as filling proceeds and consolidated.
• Backfilling of holes not completely filled with concrete: Excavated material, well rammed and consolidated.
730 EXPOSED CONCRETE FOUNDATIONS • Filling: Compact until air bubbles cease to appear on the upper surface. • Finishing: Weathered to shed water and trowelled smooth.
740 SETTING POSTS IN EARTH • Holes: Excavated neatly, with vertical sides and as small as practicable to allow refilling. • Filling: Position posts/ struts and replace excavated material, well rammed as filling proceeds.
750 DRIVEN POSTS • Damage to heads: Minimize. - Repair: Neatly finish post tops after installation.
760 NAILED WOOD RAILS • Length (minimum): Two bays, with joints in adjacent rails staggered. • Fixing: Nail each length of rail to each post with two 100 mm galvanized nails. • Rails with split ends: Replace.
770 SITE CUTTING OF WOOD • General: Kept to a minimum. • Below or near ground level: Cutting prohibited. • Treatment of surfaces exposed by minor cutting and drilling: Two flood coats of solution recommended for the purpose by main treatment solution manufacturer.
780 MAKING GOOD GALVANIZED SURFACES • Treatment of minor damage (including on fasteners and fittings): Low melting point zinc alloy repair rods or powders made for this purpose, or at least two coats of zinc-rich paint to BS 4652.
• Thickness: Apply sufficient material to provide a zinc coating at least equal in thickness to the original layer.
790 SITE PAINTING • Timing: Prepare surfaces and apply finishes as soon as possible after fixing.
COMPLETION
910 CLEANING • General: Leave the works in a clean, tidy condition. • Surfaces: Clean immediately before handover.
Page 53 of 54
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84 |
Page 85 |
Page 86 |
Page 87 |
Page 88 |
Page 89 |
Page 90 |
Page 91 |
Page 92 |
Page 93 |
Page 94 |
Page 95 |
Page 96 |
Page 97 |
Page 98 |
Page 99 |
Page 100 |
Page 101 |
Page 102 |
Page 103 |
Page 104 |
Page 105 |
Page 106 |
Page 107 |
Page 108 |
Page 109 |
Page 110 |
Page 111 |
Page 112