East Anglia ONE Offshore Windfarm Landscape Management PlanWork No 38 to 41
August, 2016
6 Maintenance 6.1 Aims 76. The design aspirations for the landscape proposals for substation are:
To create a robust and easily maintained landscape framework. To provide elements of visual screening towards the substation. To provide enhanced habitat opportunities in selected locations.
77.
To achieve the landscape objectives and ensure the success of the landscape setting, an ongoing regime of landscape maintenance and management will be necessary. The overarching management and maintenance objectives are:
To ensure full woodland and hedgerow establishment to provide visual screening and landscape structure. To ensure vegetation is kept healthy and vigorous, promoting good form, stem colour, flowering and structure of vegetation as appropriate.
To ensure appropriate maintenance operations are undertaken as necessary to ensure public safety. To promote the creation of rich and ecologically diverse interconnected habitats where appropriate. To ensure planting within the SuDS basins and swales are successfully established. To ensure pathways and access roads are kept free and clear of overhanging or nuisance vegetation. To allow the introduction of self-seeding of flowering species to encourage insects, which in turn may provide food sources for birds and bats to enhance local biodiversity.
78.
Woodland and hedgerow maintenance will be undertaken for a period of 10 years within woodland and hedgerow planted areas (WM1 -WM4 and H1). Any tree or shrub planted as part of the landscaping scheme that, within a period of 10 years after planting, is removed, dies or becomes seriously damaged or diseased, will be replaced in the first available planting season, with a specimen of the same species and size as that originally planted. Grassland maintenance during the establishment period will be undertaken for a period of 5 years within grassland habitat areas (G1 – G7).
6.1.1 Legal Obligations 79.
Maintenance will be carried out in accordance with relevant legislation. 6.1.2 General Requirements
80.
The following requirements for maintenance will apply to all planted areas within the EA ONE DCO boundary shown in the Soft Landscape General Arrangement (Appendix 2):
All landscape maintenance tasks to be undertaken by a competent contractor. All trimming and pruning of plants to be carried out once plants have flowered, seeded and shown fruit. Any management works related to soft landscape generally to be left until late Autumn.
No fertiliser or pesticides will be used. All arisings from landscape maintenance to be removed from site or stored with approval from relevant authorities. Watering to be carried out as required to ensure the successful establishment of the soft landscape proposals as detailed in Tables 6.1 – 6.7.
All planted areas within the EA ONE DCO boundary shown in the soft landscape general arrangement drawing (Appendix 2) will be kept clear of weed growth for the first 3 growing seasons; after 3 years, a herb layer can be allowed to return.
Weed control generally throughout all areas of the site to include spot herbicide treatment or manual removal of the following: - all broad leaved weeds. - docks (Rumex spp). - injurious weed species listed in theWeeds Act 1959 andWildlife and Countryside Act 1981. - Japanese knotweed (Fallopia spp). - nettles (Urtica spp). - ragworts (Senecio spp).
East Anglia ONE – EA1-CON-F-GBE-008554
Page 24
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84 |
Page 85 |
Page 86 |
Page 87 |
Page 88 |
Page 89 |
Page 90 |
Page 91 |
Page 92 |
Page 93 |
Page 94 |
Page 95 |
Page 96 |
Page 97 |
Page 98 |
Page 99 |
Page 100 |
Page 101 |
Page 102 |
Page 103 |
Page 104 |
Page 105 |
Page 106 |
Page 107 |
Page 108 |
Page 109 |
Page 110 |
Page 111 |
Page 112