search.noResults

search.searching

note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
OPEN_796_EAONE_LANDSCAPE_SPECIFICATION 10 Aug 2016 APPENDIX 9


GATES, POSTS AND STILES


510A DEER / RABBIT PROOF FIELD GATES F3 • Description: Wide single leaf timber field gate, with heavy toprail and cross bracing. To provide maintenance access into newly planted woodland areas protected by deer/rabbit proof fencing.


• Manufacturer: Submit proposals. - Product reference: Submit proposals.


• Size: 1900 mm high x 3000 mm wide. • Materials: Wood gate and posts. - Treatment: To provide a 30 year service life. - Finish: None.


• Fittings: Adjustable hook and band top hinge, double swing rocker bottom hinge and loop over catch. - Finish: Hot dip galvanized to BS EN ISO 1461.


• Method of setting posts: Concrete foundation, 450 mm square x 600 mm deep. • Accessories: Additional mesh - wildlife netting.


550 WOOD GATES AND POSTS • Manufacturer: Submit proposals. • Standard: To BS 5709. • Wood: Homegrown hardwoods. • Treatment: As section Z12 and Wood Protection Association Commodity Specification C3. - Type: To provide a 30 year service life. - Finish: None.


• Adhesive: Synthetic resin to BS EN 301, type 1. • Workmanship: As section Z10. • Fittings: Two tee hinges, return spring and a ring latch. - Finish: Hot dip galvanized to BS EN ISO 1461.


• Method of fixing: Concrete foundation, 450 mm square x 600 mm deep. • Accessories: Additional mesh - wildlife netting and Gate opener.


EXECUTION


710 INSTALLATION GENERALLY • Set out and erect: - Alignment: Straight lines or smoothly flowing curves. - Tops of posts: Following profile of the ground. - Setting posts: Rigid, plumb and to specified depth, or greater where necessary to ensure adequate support.


- Fixings: All components securely fixed.


715 COMPETENCE • Operatives: Contractors must employ competent operatives. • Qualifications: Submit certification of training. - NHSS Sector Scheme 2A sub categories: - (a); - (d); - (f); and - (g).


- NHSS Sector Scheme 2C sub categories: Not required. Page 52 of 54


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112