search.noResults

search.searching

note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
OPEN_796_EAONE_LANDSCAPE_SPECIFICATION 10 Aug 2016 APPENDIX 9


650 NOTICE • Give notice before: - Setting out. - Spreading topsoil. - Applying herbicide. - Applying fertilizer. - Visiting site during maintenance period. • Period of notice: 1 week.


655 MECHANICAL TOOLS • Restrictions: Do not use within 100 mm of tree and plant stems.


660 GRADING SUBSOIL • General: Grade to smooth flowing contours to achieve specified finished levels of topsoil. • Loosening: - Light and non-cohesive subsoils: When ground conditions are reasonably dry, loosen thoroughly to a depth of 300 mm.


- Stiff clay and cohesive subsoils: When ground conditions are reasonably dry, loosen thoroughly to a depth of 450 mm.


- Rock and chalk subgrades: Lightly scarify to promote free drainage.


• Areas of thicker topsoil: Excavate locally. • Avoid over compaction.


665 SUBSOIL SURFACE PREPARATION • General: Excavate and/ or place fill to required profiles and levels, as section D20. • Loosening: - Light and non-cohesive subsoils: When ground conditions are reasonably dry, loosen thoroughly to a depth of 300 mm.


- Stiff clay and cohesive subsoils: When ground conditions are reasonably dry, loosen thoroughly to a depth of 450 mm.


- Rock and chalk subgrades: Lightly scarify to promote free drainage.


• Stones: Immediately before spreading topsoil, remove stones larger than 75 mm. • Remove from site: Arisings, contaminants and debris and Builders rubble.


670 INSPECTING FORMATIONS • Give notice: Before spreading topsoil for areas to receive forestry planting and lawn areas. • Notice period: 14 days.


675 PREPARATION OF UNDISTURBED TOPSOIL • Standard: In accordance with BS 4428. - Grading and cultivation: Category A.


• Hard ground: Break up thoroughly. • Clearing: Remove visible roots and large stones with a diameter greater than 75 mm. • Areas covered with turf or thick sward: Plough or dig over to full depth of topsoil. • Fallow period (minimum): Three months. - Weed control: At appropriate times seed with an approved leguminous seed mix.


680 SURPLUS TOPSOIL TO BE RETAINED • Generally: Spread and level on site: - Locations: Any areas where topsoil is required for new planting. - Protected areas: Do not raise soil level within root spread of trees that are to be retained.


Page 22 of 54


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112