This content requires Adobe Flash Player version
or later.
Either you do not have Adobe Flash Player installed,
or your version is too old,
or there is a problem with your Flash installation and we were unable to detect it.
at East Anglia Three 12:20 – move to AWAC 3.1 MiniLander site 13:20 UTC – water samples (T=pre‐rec) at AWAC 3.1 ‐ CTD rosette 13:40 – 14:05 UTC – manoeuvre to grapple surface buffs on AWAC 3.1 (dep. 5) 14:30 UTC ‐ MiniLander recovered
14:35 UTC – contact with guard buoy 14:45 – 18:50 UTC – recover guard buoy
20:20 – guard buoy deployed (toroid 45)
19:50 UTC – AWAC 3.1 (dep. 6) MiniLander deployed 20:25 UTC‐21:00 UTC – Water samples (T=post dep) at AWAC 3.1 – CTD rosette 21:10 UTC – 21:20 UTC – day grab samples at AWAC 3.1 site 21:25 UTC – left AWAC 3.1 site for AWAC 4.1 ADCP survey
23:30 UTC – commence 13hour ADCP survey AWAC 4.1
All CTD water samples filtered in preparation for SPM analysis All grab samples stored and labelled prior to PSA determination