2.1 Summary of Vessel activities A total of eight trips were undertaken aboard RV Cefas Endeavour to accomplish the planned work. All trips departed and returned to Lowestoft except for the second deployment trip that disembarked in Swansea. Daily log sheets for all offshore planned activities are in Annex 3. On several occasions the EAOW operational work was undertaken as part of a longer trip on the vessel. Where this was the case, the daily log sheets cover only the periods where the activities on board were primarily to fulfil the EAOW contract.
2.2 Deployment Positions The work comprised the deployments of two types of equipment (MiniLander equipped with Nortek AWAC current profiler/Cefas ESM2 logger and Directional Waverider) for a period of approximately 12 months in the East Anglia THREE project area (see figure 1).