The primary method of mitigation when dealing with the archaeological resource is the precautionary principle, based on the prevention of damage to receptors by proactively putting in place protective measures rather than attempting to repair damage (which may be irreversible) after it has occurred. To achieve this, embedded mitigation will be applied (see section 17.3.3 above).


59.


Potential impacts of the proposed East Anglia THREE project upon the setting of onshore cultural heritage assets are considered as part of the Chapter 25 Onshore Archaeological and Cultural Heritage chapter. Known heritage assets within the East Anglia THREE site are confined to wreck sites (A1s and A3s) and sites of potential anthropogenic origin and archaeological interest (A2s). Wrecks lost other than by design are not regarded as having a setting as their siting is based on chance alone. As such, potential impacts upon the setting of the maritime sites outlined in this assessment are regarded as negligible.


17.4.4 Cumulative Impact Assessment 60.


The cumulative impact assessment presented in this chapter was carried out in accordance with the methodology set out in Chapter 6 Environmental Impact Assessment Methodology and is based on available standards and guidance (COWRIE 2008 and Renewable UK 2013), best practice, consultation and on professional judgement.


61.


As defined for the purposes of this impact assessment, cumulative impacts are those which could occur as a result of the proposed project in conjunction with other, existing or planned offshore windfarms or other planned marine and coastal developments or activities. Cumulative impacts may therefore occur to archaeological receptors that have the potential to be incrementally impacted by other existing, consented and / or proposed developments or activities. These impacts maybe regarded individually as minor but collectively as significant. However, the emphasis is on the assessment of potentially significant impacts rather than on comprehensively cataloguing every conceivable impact that might occur.


62.


The assessment of cumulative impact upon archaeological receptors therefore considered whether impacts on a receptor could occur on a cumulative basis between the proposed project and other windfarmprojects, activities and plans in the area (either consented or forthcoming). Other known plans or projects considered as part of this cumulative impact assessment are outlined in section 17.7.


63.


Significant cumulative impacts are restricted to direct impacts upon the potential archaeological resource from the East Anglia THREE site and offshore cable corridor


Preliminary Environmental Information May 2014


East Anglia THREE Offshore Windfarm


Chapter 17 Offshore Archaeology Page 34


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116  |  Page 117  |  Page 118  |  Page 119  |  Page 120  |  Page 121  |  Page 122  |  Page 123  |  Page 124  |  Page 125