ACCELERATED DELIVERY


Sikafloor supplied a seamless, rapid-apply, non-slip surface to ensure that production at a Rolls Royce car assembly plant continued without interruption.


Contractor, Zircon Flooring, was chosen to refurbish 14,000m2


of industrial flooring


at the Rolls Royce vehicle production site in Chichester, West Sussex. The client required a surface with a detailed, high-quality finish. With durability and low-maintenance among its many other benefits, Sikafloor’s high-quality resin system proved ideal for the project.


A flooring installation of such magnitude presented a number of challenges which had to be overcome if the contractor was to meet the client’s strict 18-day deadline and ensure minimal disruption to the plant’s day-to-day running. It meant Sikafloor had to live-up to its easy-to-apply, high-performance billing to ensure the testing timetable of works was adhered to.


SPARKS SHALL NOT FLY To overcome random static charges which can affect sensitive electrical components and wreak havoc on a busy car production line, Sika provided its Sikafloor-262AS, a two- part electrostatically conductive textured epoxy coating for the floor’s refurbishment. With good chemical and mechanical resistance, this slip-resistant flooring system is designed to deliver the ultimate in static control and has an excellent reputation in industries where there is sensitive electronic equipment such as hospitals, TV studios and pharmaceutical manufacturing plants.


Sikafloor-262 AS is a decorative and protective anti-static coating which is available in an unlimited choice of colour shades. The unique high-build system comprises Sikafloor-161 primer, Sikafloor- 220W conductive coat, Sikafloor-262 AS wearing course, and Sikafloor-263 SL, a two-part, multipurpose binder based on epoxy resin.


As well as its excellent technical and aesthetic properties, the Sikafloor system has a ‘refreshability’ option to extend its lifecycle, thus providing a cost-effective, sustainable alternative to the installation of a complete new floor.


For the Rolls Royce project, Zircon prepared the concrete substrate


42 | INDUSTRIAL FLOORING


by mechanically shot-blasting and diamond-grinding the surface using dust-controlled methods to ensure plant operations elsewhere were not affected. Sikafloor-161 primer was then applied, followed by Sikafloor-263 SL multipurpose binder.


“With good chemical and mechanical resistance, this


slip-resistant flooring


system is designed to deliver the ultimate in static control.”


Once levels were checked and grinded as required, Sikafloor Earthing Kit, a conductor system comprising copper earthing tapes and points, was installed. A layer of Sikafloor-220W anti-static primer was added, and once cured, the flooring was finished with Sikafloor- 262AS to a nominal thickness of 2mm.


SURFACE SUPREME With work starting in December and continuing during the festive period, 7,000m2


of existing floor had to be


ground-off before relaying could start, with Zircon’s teams working throughout the night to ensure the project’s completion in readiness for the new year and the site’s return to full operation. To further minimise disruption, Sika and Zircon employed a detailed project management programme. This was drawn-up with full client agreement in order for work to be scheduled around the plant’s production needs.


This effective project management meant the intensive refurbishment was completed to the given deadline and the client’s full satisfaction. The superb new floor stands as a smart, seamless, showcase for the versatility and durability of Sika’s exemplary flooring range.


www.sika.co.uk www.tomorrowscontractfloors.com


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64