14 • Log • Feb. 12 - 25, 2016 • The Log
Long Beach, Army Corps to study breakwater adjustment
environment located in a heavily urbanized location, near one of the world’s largest port complexes, at the mouth of one of the nation’s most altered rivers, the Los Angeles River,” said U.S. Army Corps of Engineers Deputy Commanding General for Civil and Emergency Operations Maj. Gen. Ed Jackson. City and federal officials stated the ecosystem restoration would not nega- tively impact coastal homes or infra- structure. Long Beach Mayor Robert Garcia
said a restored ecosystem off his city’s coast would have a positive impact on many levels. “This is a momentous occasion for
Long Beach Breakwater could either be reduced in size or eliminated altogether to promote recreational activi- ties and restore the local ecosystem. The city of Long Beach and U.S. Army Corps of Engineers have partnered together to study the impacts of removing or reconfiguring Long Beach Breakwater.
Breakwater could be removed or reconfigured to promote recreational activities, ecosys- tem restoration.
By Parimal M. Rohit
LONG BEACH — The future of Long Beach Breakwater is back in the news cycle again as local, state and federal leaders held a joint signing ceremony last month to announce a cost-sharing partnership for the East San Pedro Bay Ecosystem Restoration Study. Officials previously referred to the feasibility study as the Long Beach Breakwater Project. The breakwater off the Long Beach coast and east of the city’s commercial harbor could be reconfigured or completely removed, depending on the results of the feasi- bility study, Both the city of Long Beach and
U.S. Army Corps of Engineers aim to use the study’s results to restore the local ecosystem, provide additional recreational opportunities and make other offshore improvements. Details of what recreational oppor- tunities would be increased have not
yet been revealed. Questions also remain whether removing or adjusting Long Beach Breakwater, which is the eastern-most of three breakwaters off the Long Beach-San Pedro coast, would impact recreational boating or fishing. Reconfiguring or removing Long
Beach Breakwater could result in cleaner water in the San Pedro Bay. “The study’s purpose is to evaluate
opportunities for ecosystem restora- tion, increased recreational opportuni- ties, and other improvement in the San Pedro Bay off the Long Beach shore,” an Army Corps environmental assess- ment published in March 2014 stated. “The study has not commenced yet and is expected to take three years to complete.” A recently enacted federal rule
known as “3x3x3” would require the feasibility study to be completed with- in three years and have a maximum federal budget of $3 million. The proj- ect must also be reviewed concurrently by the three levels (district, division and headquarters) of the Army Corps. “We have a unique opportunity, and a challenging task to investigate together how we can best restore a Southern California coastal marine
ISLAND YACHT ANCHORAGE 25'-55' SLIPS AVAILABLE NOW!
Long Beach because restoring our local ecosystem will have global implica- tions. Improving the coastal experi- ence and ecosystem in our city is a win for residents [and] visitors, and will be a boost for the Long Beach economy,” he said.
The feasibility study will look at the
coastal area between the Long Beach shoreline and the offshore Middle and Long Beach breakwaters. “Intervention is needed to correct deficiencies and restore the environ- ment within the study area. Otherwise, the degradation of the East San Pedro Bay ecosystem will continue with the existing development, increase to the population and demand for recre- ational activities in the study area,” an Army Corps fact sheet about the restoration project stated. “The city of
Summarized Financial Data:
Long Beach has requested to provide $1.5 million in accelerated funds and $750,000 in contributed funds to com- plete much of the study.” Reconfiguring the breakwater just off the Long Beach coast has been a topic of discussion since at least 2005, when council members decided to conduct a reconnaissance study of the offshore structure. The city of Long Beach appropriat- ed $100,000 in 2007 to determine whether congressional leaders and the Army Corps had any interest to, according to City Manager Patrick H. West, “look at our breakwater as a sig- nificant project.” Council members voted on June 22, 2010 to allow the city to pursue an esti- mated $4 million cost-sharing agree- ment with the Army Corps to study ecosystem restoration of the East San Pedro Bay. Less than six months later then-
Mayor Bob Foster and Army Corps rep- resentatives hosted a signing ceremony at Bluff Park to commemorate a joint agreement between the two agencies to fund a breakwater feasibility study similar to the one announced last month. City officials announced in 2010 the feasibility study would cost about $8 million, with Long Beach and the Army Corps splitting the cost evenly. The breakwater feasibility study was
Estimated Federal Cost . . . . . . . . . . . . . . . .$1,753,000 Estimated Non-Federal Cost . . . . . . . . . . .$1,400,000 Total Estimated Project Cost . . . . . . . . . . .$3,153,000 Allocation thru FY14 . . . . . . . . . . . . . . . . . .$103,000 Allocation for FY15 . . . . . . . . . . . . . . . . . . . .$50 President’s Budget for FY16 . . . . . . . . . . .$0 House Report for FY16 . . . . . . . . . . . . . . . .TBD Senate Report for FY16 . . . . . . . . . . . . . . . .TBD Balance to Complete After FY16 . . . . . . .$1,537,000
(As of Feb. 17, 2015) Source: U.S. Army Corps of Engineers
broached again by the city’s Transportation and Infrastructure Committee in June 2011 and discussed in some form at City Council meetings between 2012 and 2015. The Army Corps owns and
operates Long Beach Breakwater; it was completed in 1949 as an extension of a similar rock struc- ture in San Pedro. There are also offshore breakwaters at Long Beach Harbor and Los Angeles Harbor. The three breakwaters (Long Beach, Middle and Los Angeles) cover 8.6 miles of San Pedro Bay, according to the Army Corps.
Stop Sailing in an Outhouse Forget About It For Boats ELIMINATES:
Holding Tank Odor Frequent Pump Outs Toxic Chemicals
slips@islandyachtmarina.com www.islandyachtanchorage.com
Available at these fine retailers: San Diego/Shelter Island: Rig works, Explorer Marine Service, Shelter Island Inflatables, Shelter Island Marine Electrical, Pearson Marine Fuels San Diego/Harbor Island: J&J Spearfishing Supplies Long Beach: Captain’s Locker Redondo Beach: Redondo Marine Hardware Newport Beach: Basin Marine
Learn more at
ForgetAboutItForBoats.com
thelog.com
$1050 RATES AS LOW AS PER FT.
CALL FOR SPECIALS 310.830.1111
Parimal M. Rohit photo
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52