Planning new builds Technical
Vital aspects in planning a winter sports pitch
Gordon Jaaback
New pitches are continually in demand by clubs, colleges and institutions. The chosen location is either available farmland or exists as part of the property made available after re-configuration of the existing layout. But there are so many hurdles to clear before there can be an active move to create the new pitch as Gordon Jaaback, a leading specialist consultant in construction and drainage, explains
Aerial view of Latton Farm - Hadlow Rugby Football Club development © Gordon Jaaback
N Every unknown situation must be explored 128 I PC AUGUST/SEPTEMBER 2015
ew pitches are continually in demand by clubs, colleges and institutions. The chosen location is either available farmland or exists as part of the property made available after reconfiguration of the existing layout. But there are so many hurdles to clear before there can be an active move to create the new pitch.
In judging the suitability of the land, there are a number of measurable assessments that are vital considerations - how the land falls or undulates (topography), the variation in the soil profile - particularly the nature of the topsoil - and the practical problems like access, parking facilities, proximity to buildings and traffic control. Then there are the local authority plans for future development. On top of all this, there is the inevitable interests of adjacent land owners and the politics that can ensue.
Funding the project is the main concern. Where funds are available, there is the option
to go straight to a qualified contractor and negotiate a design and build contract. This means saving the cost of a consultant, but it puts the added responsibility on the contractor in that he must complete all the investigations that are necessary and be in a position to guarantee his design and work. In order to secure a competitive price, approaching more than one contractor can bring peace of mind, but an extra complication arises. Proposals submitted by contractors will be different and then cannot be a compared easily. No longer is it a matter of ‘comparing apples with apples’.
Where funds are needed, the main bodies - Sport England and the Football Foundation - are the normal sources. They require the appointment of a pitch consultant and the completion of a full assessment of the project in order to grant funds. The assessment is normally completed in the form of the following.
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84 |
Page 85 |
Page 86 |
Page 87 |
Page 88 |
Page 89 |
Page 90 |
Page 91 |
Page 92 |
Page 93 |
Page 94 |
Page 95 |
Page 96 |
Page 97 |
Page 98 |
Page 99 |
Page 100 |
Page 101 |
Page 102 |
Page 103 |
Page 104 |
Page 105 |
Page 106 |
Page 107 |
Page 108 |
Page 109 |
Page 110 |
Page 111 |
Page 112 |
Page 113 |
Page 114 |
Page 115 |
Page 116 |
Page 117 |
Page 118 |
Page 119 |
Page 120 |
Page 121 |
Page 122 |
Page 123 |
Page 124 |
Page 125 |
Page 126 |
Page 127 |
Page 128 |
Page 129 |
Page 130 |
Page 131 |
Page 132 |
Page 133 |
Page 134 |
Page 135 |
Page 136 |
Page 137 |
Page 138 |
Page 139 |
Page 140 |
Page 141 |
Page 142 |
Page 143 |
Page 144 |
Page 145 |
Page 146 |
Page 147 |
Page 148 |
Page 149 |
Page 150 |
Page 151 |
Page 152 |
Page 153 |
Page 154 |
Page 155 |
Page 156 |
Page 157 |
Page 158 |
Page 159 |
Page 160 |
Page 161 |
Page 162 |
Page 163 |
Page 164