REMOTE LOCATION CONSIDERATIONS Firstly, the routing of the cable must take into account the seabed topography to ensure the existing burial equipment can adequately protect the cable. This leads to longer cable requirements, an increase in CAPEX and longer installation and burial operations, which in turn, increase the OPEX.


The Hi-Traq uses a unique self-levelling system to provide a horizontal chassis even whilst traversing side slopes of up to 20°. This allows a vertical, stable trench to be made for safe and efficient cable burial operations across the challenging topography. The self-levelling system allows the Hi-Traq to trench a more direct cable route which can lead to a reduction in both CAPEX and OPEX for the developer.


VARYING SOIL CONDITIONS Furthermore, the soil conditions at offshore renewable locations can change over relatively short distances. Such changes in the seabed can lead to a requirement of different forms of equipment in order to cope with the varying soil conditions. For example, in the Liverpool Bay area, the variable soil conditions meant the ploughs and jetting tools applied were unable to perform all of the burial operations and mechanical


cutting trenchers were required to complete installation. Hi-Traq has been developed as a multi-tool platform with the capacity to perform both jetting and mechanical cutting operations which facilitates burial in variable conditions without the requirement to bring in expensive, secondary, spot-market equipment.


DEDICATED VEHICLE


As the industry continues to work towards lowering the LCOE there is a requirement to bring in new technologies to benefit from the increased efficiencies, cost reductions and the reduction in overall project risk they can provide. By developing a dedicated vehicle for the operational conditions of offshore renewable installation, IHC has addressed many of the issues faced by existing assets.


The drive to make offshore renewable energy cost competitive, depends on progress right across the supply chain and installation contractors. The technology built into Hi-Traq will be a major contributor towards achieving the goals of the offshore renewables industry.


IHC Engineering Business


Click to view more info = Click to view video


www.windenergynetwork.co.uk


111


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116