This page contains a Flash digital edition of a book.
BOLTING, TORqUING & TENSIONING FEATURE SPONSOR


MARKET FIRST FOR WIND ENERGY SECTOR


Equalizer International, a world leading designer and developer of flange maintenance tools for the energy industry, is increasing its presence in the growing global renewables sector through the introduction of an innovative new alignment tool for wind turbine towers.


The company has drawn on its extensive knowledge and expertise in pipework alignment to develop its new Wind Turbine Tower Alignment Tool. This tool will be used to resolve bolt hole misalignment on flanges within the inside of wind turbine tower sections during assembly or installation.


FIRST OF ITS KIND


The tool, believed to be the first of its kind in the market, was developed in direct response to a request from European wind turbine manufacturing major Siemens Wind Power via Equalizer’s Danish distributor Hytor.


The company has an international reputation for innovation and development of flange alignment tools, taking the development of this new tool from concept to delivery in less than 10 weeks.


Equalizer’s Wind Turbine Tower Alignment Tool


SUPPORTING INDUSTRY GROWTH


Ian McCormick, Chairman and Managing Director of Equalizer International, said the company is well-poised to support the growth of the renewables industry.


“The expertise which we have developed over the past 20 years in the oil and gas industry is very transferrable to renewables both off and onshore,” he said.


“Both sectors face similar issues in pipework and flange alignment and maintenance. Our tools are already used in the renewable sector but this is the first developed specifically for the Wind Energy industry. We were able to react very quickly to meet Siemen’s requirements and we will be equally responsive to other requests from industry.


Ian McCormick


“The new turbine tower alignment tool follows the same principle as all Equalizer tools in that it will deliver significant safety, time and cost saving benefits and it can be used by any company involved in the manufacture or installation of wind turbine tower sections.”


ADDRESSING AN ISSUE


Wind turbine towers are made up of pipe sections with internal bolted flange connections and sometimes during fabrication these sections can become ovalised. This can result in misalignment of the bolt holes, which increases the difficulty and lengthens the time taken to assemble the towers.


The new tool will address this issue and make assembly and installation simpler, safer and more efficient.


ENERGY INNOVATION OF THE YEAR AWARD Earlier this month Equalizer International won the Energy Innovation of the Year award in the East of England Energy Group’s (EEEGR) Innovation Awards, held annually to recognise pioneering ideas and ground-breaking technology which can benefit the energy industry.


Equalizer International Ltd


34


www.windenergynetwork.co.uk


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100