This page contains a Flash digital edition of a book.
Winter Sports R


ichard Norton is responsible for overseeing all three sites at Bolton Wanderers, liaising with his staff on a daily basis to resolve any problems and


arrange any materials that are required. He has nine full time staff, and a further eight part timers who help out on match days.


The Reebok pitch is maintained by Mark Sinnett, with Chris Simm and Calum Bunce looking after the Chorley facility. The academy training ground, and the main subject of this article, is maintained by Gareth Lester, Michael Steele, Niall Hazlehurst, Nick Regan and Nathan Brierley. John Crossley is the club’s gardener and is kept busy looking after all the informal garden areas on both the academy and first team sites. Over the last ten years, and particularly during their time in the Premiership, there has been a significant investment in the facilities at the Reebok stadium. Clubs at Bolton’s level have embraced the latest technologies, such as pitches reinforced with Fibrelastic, Fibresand or Desso, whilst lighting rigs, undersoil heating and watering systems


have become the norm. Equally, investment in training


grounds has soared. Many clubs have replicated their stadium pitch at their training ground to ensure that players can train on an identical surface, and Bolton are no exception. Richard has been instrumental in overseeing the completion of a five year plan to provide some of the most up-to- date playing surfaces available. In 2007, the club invested in a Desso Grassmaster system and SGL lighting rigs at the Reebok, as well as embarking on the development of the new academy training facility, The Eddie Davies Football Academy.


An initial investment of over £3.5m


secured a forty acre site at Lostock, close to the Reebok, which now houses over 70,000 square metres of sand/soil based pitches, a full-sized Fibresand pitch and one the largest 3G synthetic pitches in Europe.


The first phase saw the construction of the sand/soil based pitches on the upper plateau. The area was stripped and levelled, then drained at five metre centres and an automatic irrigation system installed. A further 75mm of sport sand was added and ameliorated into the top 100mm. The area was then reconsolidated and the final levels established. A pre-seed fertiliser was applied and then the area was sown with a Johnsons Premier rye seed mix. After establishment, gravel slits were installed at 1m centres across the full width of the plateau.


Also constructed in the first phase were


the Fibresand and 3G pitches, the latter built using Desso Pro Challenger 50 carpet. All of the phase one works were carried out by Mallinsons Sports Ground Contractors. Part of the ninety-six mile long Thirlmere Aqueduct runs through the middle of the lower plateau, so the second phase was split into two stages. The aqueduct required remedial repair work, carried out by United Utilities, which involved the installation of a haul road and access holes across part of the lower plateau. The first area was sprayed to kill all vegetation. Drainage was installed at 3m


centres, followed by stone burying. 75mm of sand was applied, which was power harrowed, reconsolidated and levelled and then sand slit using a Blec Sand Master. A pre-seed fertiliser was applied before sowing with the rye seed mix. The following year, the remainder of the lower plateau was completed using the same techniques. All these groundworks were carried out by Souter Sports Ground Contractors. Five years on, the academy pitches continue to be used on a daily basis by the club’s under 8s through to under 18s, and also the reserves in the last two years.


Since the academy site has opened, usage has grown from approximately 8,000 people in the first twelve months to over 20,000 last season. This includes use by Bolton Wanderers Coach Education, Bolton Wanderers Community Trust and other groups. This high usage means that Gareth and his staff are constantly on the go, preparing and repairing pitches. Their working hours are Monday - Friday 8.00am to 5.00pm and Saturday and Sunday mornings from 8.00am to 1.00pm. In reality though, it’s all about getting the job done, however long it takes! The academy pitches are mown using a


Toro 6500D, Toro 2000D mower and a Dennis G860 cassette mower, maintaining a cutting height of 25mm, cutting daily during the growing season. All pitches are marked out on a weekly basis or as fixtures demand, this is done using a laser guided marker ensuring lines remain accurate and straight. At the end of each playing season,


Richard embarks on a rigorous renovation programme on a number of the club’s pitches. He does not have a bottomless pit of money, so often has to prioritise which ones are renovated and to what degree. As you would expect, the stadium pitch is the number one priority. At the end of 2011-12 season, after a few weeks of corporate events, the pitch was sprayed with a total weedkiller, allowing time for this to kill the grass before the contractors came on site. The pitch was koroed in two directions, with a modified spiral rake attached. Forty bags of ZeoPro


Since the academy site has opened, usage has grown from approximately 8,000 people in the first twelve months to over 20,000 last season


JUNE/JULY 2012 PC 119


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116  |  Page 117  |  Page 118  |  Page 119  |  Page 120  |  Page 121  |  Page 122  |  Page 123  |  Page 124  |  Page 125  |  Page 126  |  Page 127  |  Page 128  |  Page 129  |  Page 130  |  Page 131  |  Page 132  |  Page 133  |  Page 134  |  Page 135  |  Page 136  |  Page 137  |  Page 138  |  Page 139  |  Page 140  |  Page 141  |  Page 142  |  Page 143  |  Page 144  |  Page 145  |  Page 146  |  Page 147  |  Page 148