This page contains a Flash digital edition of a book.
promotional feature Gerflor’s Fast track


Sports Hall Flooring refurbishment Solutions that don’t cost the earth!


I


n the days of austerity, indoor sports floors that have ‘seen better days’ don’t always have to be uplifted and replaced. You can save money, down time and environmental impact by leaving the old floor in place and over laying it.


Gerflor, a leading manufacturer of Taraflex™ Sports Floors,


have recently launched a number of product solutions that can be installed directly over the old sports surface. This can save a small fortune in costs and can be quickly installed minimising facility down time.


A Recent success: GiLLinGhAm LeisuRe centRe


During the recent facility refurbishment it was decided that the sports floor was in need of replacement. Gerflor delivered a specification and a solution that made a huge difference to the local community. The new floor was installed on top of an existing Granwood floor in only 3 days! John Havill, Chairman of Three Rivers Partnership comments:


“To think how bad the floor looked before and how it looks now is quite remarkable. Gerflor assisted in the project management of the scheme hugely and the sports hall floor refurbishment came in on time and on budget”. John Havill also added “Our customers love it, in particular the


badminton club, some even hinting this is the best sports hall they have ever played in”.


Taraflex™ sports floors have been manufactured since 1947 and


offer a number of user and operator benefits including optimum user safety, comfort, performance and ease of maintenance. Tara- flex™ is an ‘Approved’ surface by many National and International governing bodies of sport.


Call or email now to take advantage of our


free SpeCifiCation aDViSarY SerViCe. Darren Wood – Sports Manager on 07836 366579 or dwood@gerflor.com David Carter – Sports Specialist on 07850 217290 or dcarter@gerflor.com


Visit www.gerflor.co.uk for further information Previous Now


See How the new taraflex™ eco-fit system compares to a traditional refurbishment


ITEM (based on 594SqM)


UPLIFT OLD FLOOR DISPOSAL OF WASTE


PREPARATION OF SUB FLOOR INSTALL NEW SPORTS FLOOR LINE MARKING (8 Game Lines) PROJECT TOTAL PROJECT TIME


TRADITIONAL SPORTS FLOOR


£ 3, 975 £ 2, 380 £ 3, 524 £ 28, 153 £ 2, 290 £ 40, 322 10 days


NEW TARAFLEX™ ECO-FIT METHOD


£0 £0 £0


£ 22, 692 £ 2, 290 £ 24, 982 4 days


POTENTIAL SAVINGS OF UP TO 40%!


TARAFLEX PAYMENT PLAN*


Total Cost of Project £24, 982


Deposit £5,000


Monthly Payments £347 Term – 60 Months


©cybertrek 2012


Twitter: @leisureopps


Read Leisure Opportunities online: www.leisureopportunities.co.uk/digital


5


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24