4. Provide pre-c your team


construction information to


You need to provide information to your team - for example, information about the site and any potential hazards, what you want from the project and how the end product will be used. This will help your team to plan, budget and work around problems.


5. Cooperate and coordinate work


As the client, you need to ensure that your team cooperate and coordinate to maintain the health and safety of everyone who may be affected by the work. This should involve early discussions about the finished construction feature, its build, manageability and useability. Ignoring these issues could lead to unexpected costs or injuries to either construction workers or end users


6. Report any obvious risks


Communicate any obvious risks to the team as soon as practicable to enable the issue to be discussed and a solution to be formulated


7. Observe and apply the principles of prevention when completing duties


Always take account of the general principles of prevention when carrying out duties under the regulations


Notifiable projects


A construction project is deemed notifiable where work lasts more than 30 days or involves more than 500 person working days. The term ‘notifiable’ means that The Health and Safety Executive (HSE) must be notified by the appointed CDM Coordinator using form F10. Notification now needs to be completed at the point when duties arise,


including the making of appointments by the client.


8. Appoint a CDM Coordinator


This role was formerly known as the Planning Supervisor under CDM 1994. The CDM Coordinator is there to assist you with your duties as client on notifiable projects. The CDM should be appointed as soon as possible, but no later than the initial design stage.


Their role should include:


• To help select competent designers and contractors


• To identify the information required by the project team


• To notify HSE of the project


• To coordinate health and safety arrangements during the planning stage


• To appraise the initial construction phase plan and ensure its suitability


• To prepare a health and safety file for you including useful health and safety information that will help you manage health and safety risks during any subsequent maintenance, construction, repair or demolition


9. Appoint a Principal Contractor


The Principal Contractor is required to plan, manage and coordinate the construction phase of a notifiable project. They are usually the main contractor for the work and should be appointed at the earliest opportunity to ensure they are involved in discussions about the build, manageability and useability. An early appointment also ensures that they have plenty of time to plan the works sufficiently


10. Ensure an adequate Health and Safety Plan is in place.


It is the Principal Contractor's responsibility to produce the construction phase health and safety plan. This document should include all key arrangements to ensure that the work is completed safely. It is your responsibility to ensure that work does not start on site until such a plan is in place.


11. Keep the Health and Safety File


The CDM Coordinator will produce the health and safety file for the project, and it is your responsibility to keep the file safe but made available to anyone who needs to alter or maintain the new structure. This document should be updated/changed as circumstances change


To conclude, it is vital that you ensure that CDM 2007 is followed to minimise the risk of a dangerous or fatal accident occurring while construction work is being carried out. Additionally, it should ensure that the finished project is safe to use and maintain and should minimise any unexpected costs, therefore providing good value. Failure to appoint a CDM Coordinator or


Principal Contractor on a notifiable project means that you are legally liable if their roles are not carried out satisfactorily. Serious breaches of Health and Safety law on your project could result in construction work being stopped and, in the most serious circumstances, you could be prosecuted. For more information go to the Health and Safety Executive website at www.hse.gov.uk.


The new Trimax PegasusS3 makes short work of the biggest mowing jobs.


4.93 and 6.10 metre cutting widths give you the ability to mow large areas quickly and efficiently and with Trimax‘s exclusive Lazerbladez™ system you get a top quality finish no matter what the conditions.


Roller bearings: New Trimax Tri-Bolt™


Sealmaster®


bearing inserts for ultra high bearing life.


 www.trimaxmowers.com


tmpc1009 65


bearing housings with SKWEZLOC®


Hinged wash vents for easy cleaning of transmission chambers.


Cut height indicators for easy and accurate setting of cut height.


Multi-voltage LED road lighting.


High quality Bulldog® stand.


Jack


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116  |  Page 117  |  Page 118  |  Page 119  |  Page 120  |  Page 121  |  Page 122  |  Page 123  |  Page 124  |  Page 125  |  Page 126  |  Page 127  |  Page 128  |  Page 129  |  Page 130  |  Page 131  |  Page 132
Produced with Yudu - www.yudu.com