Andrews keeps data centre afloat
HEN A BURST pipe threatened loss of critical temperature control in the data centre of a major telecommunications company, Andrews Chiller Hire were called upon to deliver a solution that would achieve and maintain constant air temperature while the in-house air conditioning system was shut down for repair and testing. Since the water leak was discovered on a Saturday, maintenance staff needed to contact a chiller hire company that could support them immediately, providing a solution to protect the expensive equipment at the data centre. Should the air conditioning system have to be shut down, without any alternative supply of chilled air, it would be extremely costly, with the company facing millions of pounds per hour in lost revenue, and potential contractual supplier fines. Andrews Chiller Hire was the first point of contact since it offers ‘local’ availability of chillers and associated equipment and there is no such thing as closed-at- weekends; the company provides round- the-clock service, 365 days a year. It is this level of support backed by experienced staff that has enabled Andrews to deliver,
W ACR News August 2015
promptly, so many temporary fully engineered solutions.
Data centres with their banks of computer suites demand a consistent temperature controlled environment. Heat dissipated from computers, servers and other associated electronic equipment is a major contributor to rising room temperatures hence the requirement for a reliable air-conditioning system. With any temperature rise there can be a subsequent increase in room humidity creating potential from electrostatic discharge which is detrimental to safe and secure computer performance. The outcome is potential total loss of or corruption to data.
The emergency phone call to Andrews Chiller Hire was made on a Saturday afternoon and within just one hour a solution had been formalised with the customer and the required equipment and engineering team mobilised.
To meet the high-level air-conditioning demands of this telecommunications data centre, which is split over two floors, Andrews Chiller Hire supplied a range of duplicated equipment so that it could be installed on opposite sides of the building
to achieve essential critical temperature control. On each side of the building engineers installed a 750kW chiller that delivered chilled water to five air handlers, (three supplying the top floor and two the lower floor). Since this had to be a totally independent solution Andrews also installed one 550kVA generator on each side of the building, connected to a 3,000 litre fuel tank.
In many installations air handlers act as recirculating systems, drawing air from a room, routing to the chiller and returning the air at a much lower temperature. For this data centre there were site restrictions in doorways for ducting therefore air handlers chosen were tasked with delivering chilled ambient air by use of cooling fluid from a 750kW chiller. This provided sufficient cooling allowing the data centre maintenance team to shut down their system and bleed it, without actually closing down the routine functionality of the datacentre. Only once all pipework had been tested using ultra sound technology and any leaks repaired was the in-house air-con plant returned to full duty.
www.andrews-sykes.com Visit ACR News online at
www.acr-news.com
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48