The challenge in maintaining reliable piping systems


Jorge Solorio explains how to avoid premature corrosion in piping systems used for mining engineering applications.


materials or leaching precious metals from the ground, the challenge to maintain long-term, reliable piping systems is significant. Extracting minerals of lower concentration from deep earth causes a shift in the chemistry of processed ores. Tis can result in internal and external corrosion, as well as sedimentation and crystallisation and ultimately, creating ongoing maintenance challenges and costly premature failures.


T


The solution Unlike traditional metallic pipes, Corzan industrial piping systems are made from a non-corrosive, durable chlorinated polyvinyl chloride (CPVC) technology that makes them chemically inert to most mineral acids, bases and salts, and aliphatic hydrocarbons found in mining applications, as well as chemical processing, water systems, and wastewater treatment facilities. Corzan piping systems, constructed from a speciality high-performance material, provide excellent hydraulic


capabilities that ensure optimal flow rates and lower installation costs. Corzan industrial piping systems eliminate internal and external corrosion caused by liquids and vapours commonly found in industrial environments. Te benefits of using Corzan CPVC piping systems are as follows:


l Meets ASTM F441 material classification 4120-06, with a pressure rating 25% higher


than standard CPVC at 180˚F (82˚C) l Drop impact strength up to three times standard


CPVC piping material l Highest heat deflection temperature (HDT) of any CPVC


piping compound l Fitting material that has improved creep resistance and ability to withstand long-term, high-temperature


Areas where Corzan


CPVC industrial piping systems can potentially


52 www.engineerlive.com


Corzan pipe can be easily cut with a ratchet cutter, wheel- type plastic tubing cutter, power saw, or fine-toothed saw. Burrs and filings must be removed from the outside and the inside of the pipe.


he corrosive chemicals typically used in mining applications can wreak havoc on the integrity of traditional piping systems. Whether processing excavated raw


Primer is needed to prepare the bonding area for the addition of the cement and subsequent assembly. Use primer conforming to ASTM F656.


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60