steel entrance building, the junction with the original school abuting the sixth-form centre is made via a full-height glazed link. This link allows natural light to penetrate deep into the common room from each side while simultaneously forming a clear and expressed separation between new and old. Due to the constrained nature


“THE SIXTH-FORM BLOCK HAS PROVIDED A HIGH-QUALITY SPACE WHICH IS BOTH BEAUTIFUL AND FUNCTIONAL” HEADTEACHER ANNIE GAMMON


ALL PICS: the shape of the new sixth- form building echoes that of the existing brutalist school structure


of a site located directly behind the existing boiler house, the construction of the new sixth- form centre was not a simple task and the design had to respond to several challenges. There was limited access into the site for materials, with crane use prevented by the height of the boiler house and its associated chimney and the narrow public highway Satar Mews to the north. The size and nature of the materials selected therefore had to be given increased consideration, with one notable example being the in-situ concrete stairs which were used in lieu of pre-cast concrete, as the later couldn’t have been craned in. The sixth-form centre


building may only just have been completed, but it has already become a lively and indispensable resource for the campus and wider school community. B4E


Project data


 Contract value: £1.4m  Contract type: design and build  Area (GIA): 589 sqm (excluding 110 sqm refurbishment of previous sixth-form area in existing building)  Client: Stoke Newington School & Sixth Form  Local authority: London Borough of Hackney  Architect and lead consultant: Jestico + Whiles  Structural engineer: Price & Myers  Services engineer: Max Fordham (pre-


stage E)  Services engineer: Blackmoor Knight (post-stage E)  Acoustic engineer: Max Fordham Acoustics  Employer’s agent: Appleyards  Cost consultant: Appleyards  CDM co-ordinator: Appleyards  Rights of light surveyor: GVA Schatonowski Brooks  Approved inspector: Butler & Young  Main contractor: Mansell/Balfour Beatty


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49