‘‘IF THERE IS AN ISSUE WITH A MACHINE, WE KNOW THAT WE HAVE THE RESOURCE TO IDENTIFY AND RESOLVE THE PROBLEM AS QUICKLY AS POSSIBLE, KEEPING OPERATIONAL DOWNTIME TO A MINIMUM."
The UK wide network of Finning support branches proved invaluable within this package. Julian continued: “With a team of fully trained Finning Caterpillar engineers based just down the road in Chesterfield, we have quick access to the site, enabling us to monitor, service and offer emergency support for the entire fleet of machines at Arkwright. With the seasonal nature of the green waste industry, this monitoring support is especially important during the summer months when uptime operations are at their peak. Being an enclosed facility, incoming waste storage is at a premium.
If there is an issue with a machine, we know that we have the resource to identify and resolve the problem as quickly as possible, keeping operational downtime to a minimum.”
Julian closed by stating: “This is a long term investment, with the initial agreement between SITA UK and Derbyshire County Council being 20 years. Providing the joint solution of Caterpillar and Komptech machines within the same contract, our aim is to be at the heart of this operation for many years to come.”
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16