floors of the downtown office building. UPS systems continually convert power from alternating current (AC) to direct current and then back to AC before supplying the IT equipment. This conversion process was very inefficient because the size and design of the systems did not match the power load for the space. Most existing data centers are over- designed because of plans for future expansion that never happen, improve- ment in newer IT equipment efficiency and the general industry trend to consolidate operations. In this case, as much as 25 percent of the incoming power was wasted because of the data center’s over-designed UPS systems. To fix this problem, the entire UPS load was consolidated into one system, resulting in increased efficiency and much lower maintenance costs. Lastly, because the two UPS systems each had three indepen- dent modules and the load in the space only needed one module to operate, there was no sacrifice to redundancy.


Project Benefits The project, which took more than five


months to complete, was finalized in June 2012. The data-center upgrades are expected to result in annual savings of 1,616,411 kWh. This is equivalent to operating more than 100 average residential homes for one year or the removal of 1,115 metric tons of carbon dioxide from the atmosphere. The operating cost savings are from reduced direct-power consumption and chilled-water usage. In addition, the consolidation of the


UPS systems will directly reduce annual maintenance costs by almost $50,000 per year. With less CRAH units operating at much lower speed, maintenance costs for these units also will be reduced, equipment life span will be increased and there now is reliable cooling-system redundancy.


In addition, the new utility metering


system allowed Hawkeye Energy Solutions’ engineers to uncover a significant tenant chilled-water metering issue, which resulted in an additional 38 percent reduction in chilled-water costs for the law firm. The utility metering and monitoring sys-


tem will continuously watch for peaks and valleys in power usage. If, for any reason, the system power usage rises above its newly reduced baseline, the system will automati- cally send email alerts to the IOG director and his staff so they promptly can address the issues as they happen and before they create significant expenses. The system will ensure that the law firm realizes energy sav- ings for years to come.


INCENTIVES from the local utility brought the payback for the project to less


than one year, which was right on target with the law firm’s expectations.


Easy to retrofit. Reduced maintenance. Lasts longer.


If your hardware hasn’t held up, retrofit with Detex Advantex.®


Installation is simple with the spring-loaded tail piece. Typically, you can use the same holes as your previous hardware or cover them.


Maintenance is significantly reduced, with easy cylinder service, vandal-resistant levers, ramped end caps that resist damage, and no-hooking push pads.


Engineered to last, with high-quality materials and stamped stainless covers, Advantex ensures extended life on even your most abused doors. Our 10-year mechanical warranty is behind every Advantex product.


Scan the QR code or call for information on our Try It for 90 Days offer. When you hold Detex hardware in your hand, you’ll know.


800-729-3839 830-629-2900 www.detex.com


Circle No. 28


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84