This page contains a Flash digital edition of a book.
A proven management tool to help keep track, allocate and improve efficiency


How we can help


• Information at a glance • Keep track of current and up and coming projects easily


• Improve your department’s performance • Manage resources more efficiently • Standard or tailor made


Special Offer System only £95.00


inc 200 T Cards + P&P and VAT


Other Standard boards include:


• Maintenance Requests


• Continuous Improvement


• Staff In/out • Weekly Planners


tel 01732 871 417 web www.tcardsdirect.com Enter 3


Sponsors of the Marussia F TeSponsors of the Marussia F1 Team Innovative and Reliable Ball and Needle Valve Solutions


State of the Art Design to Reduce Potential Leak Paths.


Stem Seal Design Prevents Galling and Contamination.


Low Operating Torque eliminating the need to mount on a back plate to counteract torque.


Worldwide Instrumentation Approvals.


Our Ball Valve range is available as a single piece body design, reducing potential leak paths to the outside environment along with an anti-blow out stem and pressure energised stem seal which ensures seal integrity. The use of PEEK seat and stem seal materials allows operation over a wide temperature range from -20°C to +180°C, with alternative temperature range from -45°C to +225°C.


Our Needle Valve range incorporates dynamic sealing which eliminates the loss of seal integrity and reduces the risk of fugitive emissions along with non-wetted parts. A compact design offers a light weight body with smaller envelope, enabling closer mounting and reduction in the overall panel size.


Visit us at Valve World Expo, Dusseldorf, 27th - 29th November 2012, Stand No. 3/A72 Hall 03


For more information Bifold, Greenside Way, Middleton Manchester, M24 1SW, UK. Tel: +44 (0)161 345 4777 Fax: +44 (0)161 345 4780 Email: marketing@bifold.co.uk Web: www.bifold.co.uk


Enter 4 www.bifold.co.uk


Fire Safe in Accordance with AP1 607, API 6FA, ISO 10497.


Unique Compact Design to Save Space and Weight.


NEAR MISS / HAZARD ACTION PERSON TAKING RESPONSIBILITY FOR ACTION


ESTIMATED COMPLETION DATE DETAIL OF ACTION TAKEN


PLANT NAME


NEAR MISS / HAZARD LOCATION


REPORT AB C 0002


REF.


BRIEF DESCRIPTION OF NEAR MISS / HAZARD


DATE REPORTED BY SUGGESTIONS FOR IMPROVEMENT


TIME SHIFT


Y LOSS OF BODY PART OR SIGNIFICANT


PLANT NAME


NEAR MISS / HAZARD LOCATION


REF. REPORT A


0003 B C


BRIEF DESCRIPTION OF NEAR MISS / HAZARD


DATE REPORTED BY SUGGESTIONS FOR IMPROVEMENT


TIME SHIFT


A = CRITICAL (LIKELIHOOD OF FAT


PLANT NAME


NEAR MISS / HAZARD LOCATION


REPORT A BC 0001


REF. BRIEF DESCRIPTION OF NEAR MISS / HAZARD


DATE REPORTED BY SUGGESTIONS FOR IMPROVEMENT


TIME SHIFT


OR SIGNIFICANT


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56