This page contains a Flash digital edition of a book.
To achieve this, we have continued to invest in our


facilities, our equipment and our people. This has involved the establishment of a dedicated, five-strong finishing team, who personally handle orders for all specially finished parts. This includes the tracking of customer’s orders from placement and arrival at our facility, through the plating process, right up until final delivery.


Delivering quality and peace of mind For customers’ peace of mind on quality, Icon is able to


provide PPAP certification up to level 3 on our products. Critically, this accreditation has to be carried out at the time of manufacture and can’t be provided retrospectively. This is particularly important for those supplying products for use in the automotive sector, as this will normally be a standard requirement from their customers, the equipment specifiers. Where a lower level of quality rating will suffice, an initial sample inspection report (ISIR), can be provided. All quality checks and accreditations are carried out by Icon’s dedicated quality control team that can source and manufacture bespoke fastening products in accordance with customer specifications. Quality is approved to BS E ISO 9001-2000.


Traditional products Another example of the type of specialist products from Icon is


the traditional Philidas nut, which has been available on the UK fastenings market for around 70 years and is still widely specified and installed today. This is a high quality ‘locking’ nut used in critical applications such as the rail industry on rolling stock


and on rail tracks, where security and safety are paramount. Although the fundamental design of the nut has remained the same since it was first manufactured, it is still a reliable and important product that needs to be readily available in plentiful quantities for customers when they want it. As the UK fights its way out of recession, it is those who


have focused on service and their product offering who will be best placed to take advantage of the improving situation. At Icon, we’re looking forward to working with existing and new customers and to meeting the challenges that the months and years to come will undoubtedly have in store for us all in the manufacturing sector.


www.icon-fasteners.co.uk


About Andrew Plows Andrew Plows has been with Icon Fasteners for seven


years. He joined the company as product development manager and was appointed to his current role in 2011. As well as day to day operations and ensuring profitability, Andrew’s responsibilities include working with the specialist teams to bring new products, services and initiatives to the market. With an HND in mechanical engineering, Andrew has


a wealth of experience in the UK fastener and fixings market. Prior to joining Icon, for eight years he worked as a UK sales manager for Italian bolt manufacturer Agrati, having previously spent 12 years working for nut manufacturer Philidas Ltd.


CUSTOM MADE SOLUTIONS The one stop shop for


PLATING, PATCHING & QUALITY PLATING Electroplating, mechanical plating, and organic and zinc flake coatings.


PATCHING Pre-applied adhesives and sealants.


QUALITY From Certificate of Conformity, to 3.1b, ISIR, and PPAP Level 3.


We offer:


Bespoke CAD drawing prior to processing your enquiry/order.


A service for: milling, cutting, drilling, roll-threading, and cut-threading.


A comprehensive range of plating and patching options.


Full testing, including: 3.1b material certification, ISIR, and PPAP Level 3.


Quick turnaround from our UK, European, and Far Eastern suppliers.


On-stock holding and stock scheduling over 12 months, if required.


ICON FASTENERS Beldray Park, Mount Pleasant, Bilston, WV14 7NH Tel 01902 499263 Web www.icon-fasteners.co.uk


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92  |  Page 93  |  Page 94  |  Page 95  |  Page 96  |  Page 97  |  Page 98  |  Page 99  |  Page 100  |  Page 101  |  Page 102  |  Page 103  |  Page 104  |  Page 105  |  Page 106  |  Page 107  |  Page 108  |  Page 109  |  Page 110  |  Page 111  |  Page 112  |  Page 113  |  Page 114  |  Page 115  |  Page 116  |  Page 117  |  Page 118  |  Page 119  |  Page 120  |  Page 121  |  Page 122  |  Page 123  |  Page 124  |  Page 125  |  Page 126  |  Page 127  |  Page 128  |  Page 129  |  Page 130  |  Page 131  |  Page 132  |  Page 133  |  Page 134  |  Page 135  |  Page 136  |  Page 137  |  Page 138  |  Page 139  |  Page 140  |  Page 141  |  Page 142  |  Page 143  |  Page 144  |  Page 145  |  Page 146  |  Page 147  |  Page 148  |  Page 149  |  Page 150  |  Page 151  |  Page 152  |  Page 153  |  Page 154  |  Page 155  |  Page 156  |  Page 157  |  Page 158  |  Page 159  |  Page 160  |  Page 161  |  Page 162  |  Page 163  |  Page 164