storage case study l ...continued from page 28


sorted and stored on a hanging garment rail system on a three level mezzanine over the Goods In area. The manual overhead rail system gives River Island an efficient solution for storing and moving hanging garments, which removes the double handling that occurred in the previous facility as there is no need for staff to take anything off or carry anything around. Bisham Consulting looked at the option of automating this system, costed it and even planned it into the design, giving River Island the option of a straightforward switch when the business case comes to justify it. In DC2, unlike DC1, the warehouse beyond the mezzanine is empty of racking. Here, River Island’s investment in space allows for expansion of the multi-tier hanging garment storage and contingency space for River Island in the event of a catastrophe halting operations in DC1.


“It’s all about how quickly I can continue my business,” says Ahmed. “I can erect that building again in six months during which time I can easily maintain business from here. We take continuity of business seriously and this is reflected in the investment of both money and time.” And just as DC2 can take an emergency boxed operation, DC1 can hold, if needed, about two-thirds of the full capacity of DC2.


River Island works constantly towards leaner supply chain operations and the new DC has ‘decoupling’ points allowing River Island to operate from just one unit if, in the years to come, the supply chain is simplified to a point where the retailer decides it no longer requires the other. Separate power supplies, utilities, security desks, etc installed in each self-contained unit, gives River Island the flexibility to


sell or lease either one in the future if required.


With occupation commencing in January 2011, River Island will close down its smaller existing DC in March and the larger one at the end of May, along with its e- commerce fulfilment site.


“We were looking for somebody to say: ‘we can see what you want to achieve here and we can get you there more efficiently or more effectively than before',” says Ahmed. "Bisham Consulting has been a reassuring


knowledge base – enabling validation of our beliefs and


30 ShD October 2011 www.PressOnShD.com


strategies and instilling confidence; the Google.com of consultancy.” The Bisham Consulting team was led by company director Neil Middleton. A pragmatic and flexible response based on its technical skills and operational experience characterised Bisham's approach to the River Island project. The end result is a future-proofed European Distribution Centre that has turned out as Arif Ahmed envisaged and one that offers River Island flexibility and business continuity. Ahmed concludes: “Our DC can adapt whether we grow or decide to contract as our supply chain model changes. Furthermore, while most retailers can bounce back after a disaster, not all can continue their business in the long term without a negative effect on their brand. We do not risk managing uncertainty; moreover we are certain to manage risk.” ●


www.bishamconsulting.com


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76