search.noResults

search.searching

dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
Te four large conference rooms of varying sizes can be converted


into a single generous space, which also opens onto a roof terrace. Tis terrace will be constructed to a high load bearing specification – to enable it to take the weight of a car, for example – so it can be used for events and press launches. Five further private meeting rooms are also located on the conference floor. While the split-tower form is minimal, Hotel La Tour’s exterior will


be an attention-grabbing vision from its location at the highest point of the city. Te rainscreen cladding will have a stainless steel, mirror finish, and a 30-metre diameter stainless steel circle with a satin finish will dominate the east facing façade. Tis will be illuminated with a bespoke projected LED installation at night to form both a focal point on Midsummer Boulevard and a gateway sign to the city centre. A large sculpture, Cycloidal Form by Keith McCarter, will be in-


stalled adjacent to the entrance, where a canopy structure extends to the drop-off point, emulating the city-wide porte-cocheres. Winvic’s Director of Multi-room, Mark Jones, said: “We are natural-


ly very proud to have been awarded our first hotel contract by Hotel La Tour, and our experience of constructing extremely high-quality, build-to-rent and student accommodation schemes means we are well placed to deliver this exciting project. “Partnership work behind the scenes to date has been efficient, par-


ticularly due to taking advantage of the end-to-end benefits BIM has to offer, and with architects pHp we are truly illustrating cost and resource savings by investing in this approach. We are looking forward to seeing the mirror-finished Hotel La Tour take shape on Milton Keynes’ skyline through next year ready for a 2022 opening.” Jane Riley, Operations Director at Hotel La Tour, added: “‘We are


very excited to be working with Winvic on the construction of Hotel La Tour Milton Keynes. Te team at Winvic share our vision of bringing luxury accommodation and modern conference facilities to the heart of Milton Keynes. Hotel La Tour has a long-term interest in the growing success of Milton Keynes’ economy and this investment demon- strates our confidence in its strength.” Will Elsigood, Associate Architect at pHp, said:


“It’s not every day you get to work on a building located at the highest point of a city, so the hotel’s visibility from surrounding areas and its ability to provide panoramic views for residents, conference users and the public were key in the design. An extensive stakeholder consultation process has re- sulted in many exciting practical and aesthetically striking design features. Hotel La Tour and Winvic have been instrumental in the design reaching RIBA Stage 3/4 and ensuring the quality expect- ed of the building from the CMKAP Exceptional Developments policy is achieved, whilst also uti- lising the benefits of 3D BIM Level 2 processes See www.hotel-latourmiltonkeynes.co.uk for more details on the hotelier, Hotel La Tour.


For more information on Winvic, the company’s latest project news and job vacancies visit www.winvic.co.uk. Join Winvic on social media – visit Twitter @WinvicLtd – and LinkedIn


ALL THINGS BUSINESS


37


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87  |  Page 88  |  Page 89  |  Page 90  |  Page 91  |  Page 92