PRODUCTS IN ACTION HEAT RECOVERY


Heat recovery spreads load for butter producer


A heat recovery system from SCM Frigo’s SEC-200 has been specifi ed for Netherend Farm, a producer of artisan butter, to enhance cooling performance and improve energy effi ciency. The project was carried out by FridgeHUB, BEIJER REF’s specialist refrigeration equipment service, in collaboration with Severn Cooling & Electrical. The upgrade aimed to replace an


SOLAR PANELS


High energy density collectors at the British Library


NAKED ENERGY has completed the installation of a solar heat system at the British Library, said to be the largest of its kind in the UK. The installation comprises 950 solar collectors across 712.5m2 of the library’s roof space. It is expected to reduce the building’s CO₂ emissions by 55 tonnes and generate 216 MWh of energy annually. The technology will supply sanitary hot water and space heating. Naked Energy, which specialises in


solar heat and solar photovoltaic thermal (PVT) technology, supplied its Virtu product range, capable of converting sunlight into both heat and electricity from the same collector, off ering higher energy


COOLING SYSTEM


Hospital overcomes logistical challenges to upgrade cooling systems


A solution from ICS COOL ENERGY has helped a hospital in Scotland overcome logistical challenges to upgrade critical cooling systems. The hospital faced an urgent need for a reliable cooling solution due to its outdated infrastructure, essential for maintaining proper temperature control in operating theatres and other sensitive areas. The installation required an 80kW cooling capacity, but the plant room’s location on the upper fl oors posed signifi cant transport and access issues. To address these challenges, ICS Cool Energy conducted several site assessments to devise an eff ective installation strategy. The team selected


two i-Chiller 80kW units, which were de-gassed and disassembled at its Bradford workshop. The components


20


density compared to conventional solar panels. In a rare application of solar


technology, the collectors will also be used to help maintain the precise temperature and humidity conditions needed to preserve the national collection cared for by the British Library. The installation was approved during the planning phase, with consideration given to the library’s status as a Grade I-listed building. The collectors have a low-profi le design, ensuring they do not alter the building’s architectural appearance from the street level. This initiative aligns with broader


eff orts to transition public buildings toward renewable energy sources. The project was undertaken in partnership with CBRE Global Workplace Solutions, and Naked Energy recently secured investments to further develop and


expand its solar heat technology. ■ www.nakedenergy.com


existing heat recovery system that experienced issues with water-side freezing. The SEC-200 (Sustainable Energy Controller) was selected for its potential energy savings, reduced carbon footprint, and attractive return on investment. This unit can maintain hot water production even when the cooling system is inactive, addressing the high demands for hot water needed for cleaning and other processes. The SEC-200 recovers heat from a


Danfoss Optyma Slim condensing unit and a Modine stainless steel evaporator, with all equipment supplied by FridgeDIRECT. The system operates with refrigerant R449A


and maintains a constant temperature of 14°C in the butter preparation room. Todd Montague, director at Severn Cooling & Electrical, comments: “We engaged FridgeDIRECT to select and design the system, and the support from the FridgeTECH team in terms of design and commissioning made the whole process seamless. The install was straightforward, with prompt deliveries


ensuring minimal downtime.” ■ www.beijerref.com


LIGHTING PROJECT LEDs put printing company in high spirits


were then fl at-packed for easier transport. Upon arrival at the hospital, they were manually moved to the fourth-fl oor plant room using internal lifts, where ICS Cool Energy engineers reassembled the system. After reassembly, the


system was recharged with refrigerant, and all necessary installations were completed. By overcoming


the complex logistics


of disassembling, transporting, and reassembling the chillers in a restricted-access area, ICS Cool Energy says it minimised disruption and completed the installation effi ciently. The hospital now benefi ts from a reliable, energy-effi cient cooling system, ensuring long-term operational stability and reduced risk of equipment


failure. ■ www.icscoolenergy.com


When Scottish high-end alcohol label printing company, Spirit Label Solutions, moved into a new £5 million warehouse, it asked local business Electrical Solutions to come up with a lighting scheme, and with the help of LUCECO they delivered the solution. A site survey was conducted to assess the lighting needs, which included a warehouse required a lighting scheme suitable for both manufacturing and offi ce environments. The design aimed to balance natural light from large skylights with artifi cial lighting for darker periods. LED lighting was selected for its


ability to meet the recommended Colour Rendering Index (CRI) standards, which is important in printing to ensure


accurate colour representation. The chosen products included Luceco’s Elara Bay LED luminaires for high ceilings in the warehouse and surface-mounted LuxPanels for the offi ce areas. The installation was designed to


ensure consistent light output without the fl ickering associated with traditional lighting solutions. Chris Bryant, group MD of Electrical Solutions, says: “We chose to work with Luceco as we trusted them with their proposal and knew we were going to have their support throughout the entire project, from planning and ordering to fi tting and future repairs, and the client was delighted


with the transformation.” ■ www.luceco.com/uk


EIBI | NOVEMBER � DECEMBER 2024


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44