DS-SEP26-PG36+37_Layout 1 08/09/2026 09:50 Page 2
FASTENINGS & ADHESIVES
FEATURE
ssembly failure with ead locking solutions
the fastener’s service life can be extended. Overall, pre-applied thread lock can be more
cost-efficient as it reduces assembly time, minimises the need for manual application and lowers the risk of rework caused by inconsistent installation or premature assembly failure.
conSiderationS when chooSing a thread locking Solution It’s important to note that not all pre-applied thread locking solutions work the same way. There are many different kinds of thread lock available on the market, so choosing the right one depends on the needs of the application. In most cases, choosing thread lock is
based on three main factors: the operating temperature, the level of locking strength required and whether the assembly will need to be disassembled for maintenance or repair. For assemblies operating below 75˚C that
require low to medium locking strength and regular disassembly, AccuLock is the ideal solution. This methacrylic resin patch is reusable for up to five installations, requiring
no curing time and is ideal for general-purpose production and serviceable assemblies. Where a stronger locking performance is
needed, particularly in applications exposed to vibration or high loads, Anu-Lok 180 provides a reliable alternative. This reusable mechanical patch can operate at temperatures up to 120˚C, and is widely suited to automotive, industrial and vibration-prone applications. Precote 80 is available for applications
requiring maximum locking strength. Designed for temperatures up to 170˚C, this pre-applied thread lock creates a permanent bond and is intended for single-use applications where disassembly is not expected. We offer pre- applied thread lock across our entire range, which means it can be specified for any fastener, including bespoke components, offering greater flexibility to specify pre- applied thread lock for any application.
Selecting the right Solution Pre-applied thread lock systems provide a practical and efficient solution to minimising
fastening loosening. The availability of different formulations allows assemblies to be tailored to specific operating conditions, whether the requirement is reusability, vibration resistance, high-temperature performance, or permanent locking strength.
Accu
www.accu.co.uk
Patrick Faulkner
HMA 2A
Up to 30:1 turndown Up to 205 kW per foot Reduced NO₂/CO Emissions Air replacement or “Make-Up”
TX High efficiency
Customised design to suit each install Proven in a wide range of applications Choice of burner heat inputs up to 1150 kW
FDB
Choice of operating fuels Ideal for variable plant conditions Larger heat input available on request APL technology -modulating gas and air
FDGA
APL technology - modulating gas and air Ideal for variable plant conditions Heat input range up to 1,550 kW Choice of operating fuels
Our gas burner systems offer users reliable, high efficiency, process heating solutions.
From design, manufacturing and supply to installation, commissioning and ongoing support, we fulfill process liquid, oven and air heating needs for both new-build and conversion projects.
BESPOKE DESIGN FULL RANGE OF INTERNATIONAL ACCREDITATIONS
FDC
Heat input range up to 1,550 kW Choice of operating fuels Packaged burner design Up to 40:1 turndown
BURNERCARE SERVICE
Lanemark Combustion Engineering Limited Lanemark House, Whitacre Road, Nuneaton Warwickshire CV11 6BW United Kingdom
www.designsolutionsmag.co.uk
+44 (0) 24 7635 2000
info@lanemark.com
SEPTEMBER 2026 DESIGN SOLUTIONS 37
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52