search.noResults

search.searching

dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
COVER STORY ADVERTISEMENT FEATURE


when restored to the ‘up’ position. The LIFT-A-SYST 60 allows the


countertop to be locked in place in both the up and down positions, and is activated easily by hand with a T-release handle from either the front or rear side of the counter. MBD also made some aesthetic modifications, creating finishing cover plates in matching natural stone to completely cover the parts of the mechanism on show when it is in the ‘down’ position. Additionally, the LIFT-A- SYST 60 features a compact design that won’t interfere with the working side of the bar, maximizing service space. When creating a more accessible


environment, many establishments install a section of the counter that is in a permanently lowered position. This lowered service space often goes unused when there are no patrons who require a lowered counter. MBD and F3 needed to identify an innovative solution with the capacity to meet a high standard of accessibility for a key area of the new Tottenham Hotspur Stadium without compromising on their design. By incorporating the Southco LIFT-A-


SYST 60 into the bar space, MBD and the F3 design team have brought accessibility to areas where there traditionally hasn’t been a solution, providing a new answer to the vital need for more flexible access in public spaces. At the same time, the LIFT-A-SYST 60 allows the H Club to maximize countertop space in high traffic areas helping to maximize revenue and customer satisfaction with a continuous bartop service area. With the opportunity


for MBD to fit-out many areas of the new Tottenham Hotspur Stadium, the solution from Southco enabled them to maintain their fast pace of work and complete the project on time and within scope.


A STYLISH, ADAPTABLE SOLUTION Southco’s LIFT-A-SYST 60 unit enabled MBD and F3 Architects to design a bar space that is stylish, adaptable and accessible. By ensuring that the new Tottenham Hotspur Stadium offers a high standard of accessibility, this project has helped to further strengthen MBD’s


Southco’s LIFT-A-SYST 60 unit enabled MBD and F3 Architects to design a bar space that is stylish, adaptable and accessible


reputation as a leader in their industry. “At MBD, we are always pushing


boundaries and developing new ways to achieve the right result for our clients – it’s what we enjoy doing, said Tony Juchau, managing director of MBD. “As soon as we saw the Southco solution, we knew that it was exactly what we were looking for. It was very exciting to be able to identify an innovative solution for a project as unique as the new Tottenham Hotspur Stadium. The end result is superb.”


Southco www.southco.com





DESIGN SOLUTIONS | DECEMBER/JANUARY 2020


7


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47