• • • CASE STUDY • • •


further HPC clusters or accommodate innovations in IT, such as the introduction of increasingly powerful but power-hungry CPUs and GPUs. “We designed the system to allow for the addition of four more cooling units if we need them in the future,” said Mr Cannon. “All of the power and piping needed is already in place, so it will be a simple matter to scale up when that becomes necessary.”


Implementation: Upgrading a


live environment at UCD It was essential while installing the new system that the data centre kept running as normal and that there was no downtime. The IT department and Total Power Solutions adopted what Mr Cannon calls a “Lego block” approach; first to consolidate some of the existing servers into fewer racks and then to move the new cooling elements into the freed-up space.


The existing chilled-water system continued to function while the new DX-based system was installed, commissioned and tested. Finally, the obsolete cooling equipment was decommissioned and removed.


Despite the fact that the project was implemented at the height of the Covid pandemic with all the restrictions on movement and the negative implications for global supply chains, the project ran to schedule and the new equipment was successfully installed and implemented without any disruption to IT services at UCD.


Results: A cooling boost for assured IT services and space freed for increased student facilities


The new cooling equipment has resulted in an inherently more resilient data centre with ample redundancy to ensure reliable ongoing delivery of all hosted IT services in the event that one of the


cooling units fails. It has also freed up much valuable real-estate that the university can deploy for other purposes.


As an example, the building housing the data centre is also home to an Applied Languages department. “They can be in the same building because the noise levels of the new DX system are so much lower than the chilled-water solution,” said Mr Cannon.


“That is clearly an important issue for that department, but the DX condensers on the roof are so quiet you can’t tell that they are there. It’s a much more efficient use of space.” With greater virtualisation of servers, the overall power demand for the data centre has been dropping steadily over the years. “We have gone down from a power rating of 300kW to less than 100kW over the past decade,” said Mr Cannon. The Daedalus data centre now comprises 300 physical servers but there are a total of 350 virtual servers split over both data centres on campus. To maximise efficiency, the university also uses EcoStruxure IT management software from Schneider Electric, backed up with a remote monitoring service that keeps an eye on all aspects of the data centre’s key infrastructure and alerts IT Services if any issues are detected. The increasing virtualisation has seen the Power Usage Effectiveness (PUE) ratio of the data centre drop steadily over the years. PUE is the ratio of total power consumption to the power used by the IT equipment only and is a well understood metric for electrical efficiency. The closer to 1.0 the PUE rating, the better. “Our initial indications are that we have managed to improve PUE from an average of 1.42 to 1.37,” said Mr Cannon. “However, we’re probably overcooling the data centre load currently, as the new cooling infrastructure settles. Once that’s happened, we’re confident that we can raise temperature set points in the space and optimise the environment in order to make the system more energy efficient, lower the PUE and get the benefit of lower cost of operations.”


The overall effects of installing the new cooling system are therefore: greater resilience and peace of mind; more efficient use of space for the benefit of the university’s main function of teaching; greater efficiency of IT infrastructure and consequently a more sustainable operation into the future.


42 ELECTRICAL ENGINEERING • JULY/AUGUST 2023


electricalengineeringmagazine.co.uk


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50