search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
TECH SPOTLIGHT


Draeger Marine & Offshore Supports UK’s First Offshore CO2


Injection


Gas monitoring equipment used to ensure safe operations aboard Petrodec’s ERDA rig during trailblazing project in the Southern North Sea.


Draeger Marine & Offshore (DMO), a global leader in the field of safety technology, supplied equipment to support the UK’s first carbon dioxide (CO2 capture and storage (CCS).


) injection test for carbon


Perenco recently announced the completion of the tests at the depleted Leman natural gas reservoir in the Southern North Sea using Petrodec’s ERDA rig, the first rig in the UK to have achieved an approved safety case for supporting CCS operations.


As well as marking a major milestone for the wider Poseidon CCS project, a joint venture between Perenco UK, Carbon Catalyst Ltd, and Harbour Energy, it is the first time that CO2 UK.


has been injected for carbon storage in the


For this innovative and challenging project, DMO, which is headquartered in Rotterdam with a sister facility in Aberdeen, delivered gas detectors that were used to monitor CO2 on deck during transport and transfer.


That includes the Dräger X-zone, which was used for extensive area gas monitoring, which can fence line up to 25 devices and measure up to six gases.


Jesper de Jong, Sales Manager DMO, said: “At Draeger Marine & Offshore we are proud to have supported the Poseidon joint venture partners in this landmark project for the UK’s burgeoning CCS industry. Petrodec is well aware of the risks of CO2 expose to workers and has been cognisant to take relevant precautions to prevent incidents and workers from the project’s outset.


“By deploying our advanced gas detection solutions, including the Dräger X-zone for extensive area monitoring and the Dräger X-am 5000 for reliable personal gas monitoring, we have helped to ensure a safe environment throughout this innovative CO2 injection test.


“Our commitment to state-of-the-art safety technology is reflected in every facet of our work, from continuous on-deck gas monitoring to providing up to 15 minutes of lifesaving air with the Dräger Saver CF15 in emergency situations. This successful collaboration demonstrates that with the right tools, legacy infrastructure can be effectively adapted to drive the future of sustainable, safe energy.”


Exposure to CO2 can pose serious health and safety hazards. A common misconception is that it presents only an asphyxiation risk, however CO2 reaches toxic levels long before it has displaced enough oxygen to present such a hazard.


July Issue 2025 www.sosmagazine.biz 45


This means that the protection of workers from the risks of CO2 leaks is of the upmost importance, particularly while the industry is maturing and gaining understanding of the injection process.


A total of 15 injection cycles were performed into the Leman gas field across the test phase, mobilising 11 CO2 offshore batch refills. Perenco said the operational programme was performed in a timely and safe manner, without injection issues and with the acquisition of an exceptional dataset.


As well as proving the viability of carbon storage in the Southern North Sea, these tests also underscored the potential for the industry to widely reuse oil and gas infrastructure to deliver cost effective CCS projects.


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48