PROJECT INSIGHT | ZELUS MATERIAL HANDLING


Zelus’s integrated overload protection using strain-gauge load sensing ensures lifts remain within rated capacity.


runway. To safely execute these coordinated lifts, all cranes must operate at matching speeds. The customer provided detailed specifications


for the existing crane, allowing the Zelus engineering team to review and compare operating parameters early in the design phase. This comparison identified that the initial Zelus design, which featured VFD-controlled travel speeds of 100ft/min, did not align with the required 165ft/min operating speed of the existing crane.


Based on this feedback, the crane travel speeds were revised during the engineering phase to ensure full compatibility with the customer’s fleet. This adjustment ensured synchronised crane motion during multi-crane lifts, meeting the customer’s expectations and supporting safe, efficient handling of long and heavy precast components. By incorporating this requirement early, Zelus


delivered a crane that integrates seamlessly into an existing multi-crane environment rather than operating as a standalone system.


Structural configuration and standards compliance The final design features a top-running, double- girder crane with a span of 51ft 3in. The crane was built to CSA requirements and classified to CMAA Class C, making it well-suited for frequent lifting cycles in a production environment. A double-girder configuration provides the stiffness and stability required for heavier loads while supporting smooth trolley travel.


Structural components were engineered to control deflection and maintain alignment over time, contributing to long-term performance and reduced maintenance demands. Direct-drive end trucks were selected to


improve efficiency and reliability. By reducing mechanical complexity, this approach helps minimise wear and supports consistent crane motion throughout the system’s service life.


Hoisting system and load control The crane is equipped with an R&M electric wire rope hoist mounted on a low-headroom trolley. This configuration maximises hook travel within the available building height, a key consideration in many precast facilities.


Smooth hoist operation is supported through


precision drive control, allowing operators to position heavy loads accurately and safely. Integrated overload protection using strain-gauge load sensing ensures lifts remain within rated capacity, enhancing safety and protecting crane components.


Operator controls and safety features Crane motions are controlled using variable frequency drives on the bridge and trolley, providing soft acceleration and deceleration. This level of control reduces load swing, improves handling accuracy and supports safer operation during complex lifts.


Primary operation is achieved through radio


remote control, giving operators flexibility and improved visibility. A pendant control is included


as a secondary option, ensuring redundancy and operational continuity. Safety systems include two-step bridge travel limit switches that allow controlled slowdown before final travel limits are reached. These features help prevent over-travel while maintaining smooth crane operation and compliance with applicable standards.


Installation assistance and commissioning Following shipment to site, the crane was installed by the customer’s team with Zelus’s supervision. This approach allowed for efficient installation while maintaining oversight of critical alignment, electrical and mechanical assembly steps. Zelus supported final commissioning, including load testing and verification of all crane functions. Testing confirmed that the system met design specifications, safety requirements and operational expectations before being released for production use.


Built for demanding environments Precast concrete manufacturing places unique demands on overhead crane systems. Equipment must be robust, reliable and precisely controlled to support daily operations without interruption. This project demonstrates Zelus Material Handling’s ability to deliver custom-engineered crane solutions tailored to demanding industrial environments. By aligning engineering decisions with application needs, the resulting system provides a dependable lifting solution designed to support productivity, safety and long-term value.


ochmagazine.com | Spring 2026 15


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80  |  Page 81  |  Page 82  |  Page 83  |  Page 84  |  Page 85  |  Page 86  |  Page 87