FUTURARC INTERVIEW
QurE Quarantine Units for Emergency and Ecology
In response to the Covid-19 pandemic situation, BaF has worked together with a group of experts to develop a prototype for a negative pressure isolation ward and examination station for emergency quarantine. This proposal aims to address the lack of wards in hospitals for treatment. The QurE-team was formed to develop this design, which would also be an open source to share with the global community.
The mobile emergency quarantine hospital proposed a few key considerations for the unit to be lightweight, fast, modular, flexible for expansion and reduction, affordable, weatherproof, mobile, safe and secure. The material would be readily available and standardised enough for quick fabrication. The idea considered pre-fabrication and on-site assembly while minimising in-situ construction. These units could be quickly constructed to respond to various terrains and conditions with minimal changes.
Weather consideration and energy saving were also part of the main design issues of QurE. In the hot and humid climate of Taiwan, the pitched roofs and raised floors provide passive insulation and protect from flooding in the event of a typhoon. The ceiling spaces and raised floors also accommodate the mechanical, plumbing and medical equipment required for the quarantine unit.
The temporary quarantine hospital should be easily transported and efficiently
stored. The team considered the post-pandemic situation where all these should be circular. Thus, the system proposed uses a mature building construction technique that can be assembled and disassembled in a short period of time. This will be more sustainable and reduces waste. The QurE could be easily modified and be ready for any emergency, including natural catastrophes, in the future.
Awards for this project in 2020 included the following: Taipei International
Design Award – Bronze Award (2020); Taipei International Design Award – Judges’ Special Award; Taipei International Design Award – Social Design Award
PROJECT DATA Project Name
QurE Quarantine Units for Emergency and Ecology Location Tainan, Taiwan ROC Completion Date 2020 Gross Floor Area 72.9 square metres Number of Rooms 2 Rooms Architecture Firm
BaF (Bio-architecture Formosana) Principal Architects Ching Hwa Chang; Chin Wei Lee; Pin Wei Kuo
Mock-up Design & Project Coordination
BaF (Bio-architecture Formosana) Sponsor
BaF Foundation Main structure Reiju Construction QurE Team
National Cheng Kung University; National Cheng Kung University Hospital; Bio-architecture Formosana; TYarchitects; YS SPACEDESIGN Images/Photos BaF
9 Cross-section diagram of QurE 10 Exterior view 11 Interior view
Design Team Design & innovation:
Bio-architecture Formosana (BaF) Medical consultancy: NCKU Hospital
Master planning, construction & logistics: Bio-architecture Formosana
Visual identity & graphic design: Bio-architecture Formosana; YSDesign
Digital media & animation: Bio-architecture Formosana (BaF) BIM model: TYarchitects Structural engineering: NCKU MEP engineering & ventilation: NCKU; GreenHVAC Website maintenance: NCKU Prototype Team
Mock-up design & project coordination: Bio-architecture Formosana (BaF)
Sponsor: BaF Foundation Main structure, air-conditioner, solar panel: Reiju Construction Wall Panel, ceiling, lamp, piping, ventilation duct, anteroom sink, door: JiuHan Engineering Headboard display in the ward, e-care board: E Ink Holdings Inc. Prefabricated bathroom: Puda Industrial Co., Ltd.
Hospital beds, medical quarantine equipment display: NCKU Hospital Medical equipment: JieMeng Technology Engineering Co., Ltd. Exhibition (medical ward): Bio- architecture Formosana (BaF) Exhibition (design manual): NCKU Press Release: NCKU
system
Filter
Fresh air
10
Temperature control
9
11
FUTURARC 79
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80 |
Page 81 |
Page 82 |
Page 83 |
Page 84 |
Page 85 |
Page 86 |
Page 87 |
Page 88 |
Page 89 |
Page 90 |
Page 91 |
Page 92 |
Page 93 |
Page 94 |
Page 95 |
Page 96 |
Page 97 |
Page 98 |
Page 99 |
Page 100 |
Page 101 |
Page 102 |
Page 103 |
Page 104 |
Page 105 |
Page 106 |
Page 107 |
Page 108 |
Page 109 |
Page 110 |
Page 111 |
Page 112 |
Page 113 |
Page 114