Berthing Tariff
Contract term Annual
11 months 10 months 9 months 8 months 7 months 6 months 5 months
* Vessels over 13.5m incur a surcharge of 5% Quote
£ per metre £516 £490 £464 £435 £405 £375 £340 £299
Prices inc VAT at 20% and are valid from 1st April 2023 until 31st March 2024
Visitor berthing tariff Daily
7 nights for the price of 5 (only available if paid in advance)
Monthly (only available if paid in advance)
30 days flexible berthing (subject to availability, please ask for details)
Landing fee (maximum 4 hours)
£ per metre LOA £4.30
£21.50 £70.00 £77.50 £6 first hour, then £4 per hour
Water and Electricity charges Water - Free of charge (for environmental reasons please try to limit waste).
Electricity - Given significant fluctuations in energy costs our electricity tariff will be posted on the marina office notice board.
Electricity Notes:
Berthing Notes: 1 The basis for calculation is Length Overall or LOA, to the nearest 0.1m (including bowsprit, davits etc). We reserve the right to measure all boats.
2 Minimum chargeable length 5.0m. 3 Multihulls LOA x 1.5 for contract berthing and during June, July & August for visitor berthing.
4 Payment by standing order is offered on all contracts of 6 months or longer. This service will attract a surcharge of between 0% and 5% of the contract value.
5 Visitor rates are due in advance. 6 Visitors must depart by 1500 hours on their day of departure. 7 Maximum short stay permitted 4 hours thereafter daily visitors rates apply. 8 Tenders (up to 2.75m LOA) moored away from main vessel £400 per annum, subject to availability.
9 It is a requirement that all vessels using Mayflower Marina maintain third party (including public liability and where relevant, employer’s liability) liability cover to a sum of not less than £3,000,000.
10 All berthing is subject to the marina’s terms and conditions - copies available upon request or
www.mayflowermarina.co.uk.
1 Customers requiring metered electricity must provide their own functioning metered lead, unless some other such accurate device is provided by the Company for recording electrical consumption. Customers using metered leads must arrange to have their meters read prior to leaving their berth.
2 32Amp electricity is only available in certain parts of the marina (metered tariff only).
3 It shall be assumed that a vessel is drawing power if its electricity lead is connected to shore power.
4 Due to the marine environment the reliability of supply cannot be guaranteed. Owners with onboard freezers should ensure that the contents are covered under their insurance policy.
Mayflower Marina An Award Winning Marina
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43