CASE STUDIES


150-Tonne waste removal from abattoir balance tank


McBreen Enviro UK was commissioned to undertake the removal of waste material from a balance tank at a Midlands-based abattoir. The job required swift and efficient action, with a strict five-day deadline and the need to manage a substantial volume of material, all while maintaining high standards of safety.


Challenges:


• High waste volume: Approximately 150 tonnes of compacted waste to be cleared


• Performance target: A minimum of 30 tonnes to be removed per shift


• Confined space access: Required entry under CSE (Confined Space Entry) conditions


• Equipment coordination: Synchronised use of suction and jetting equipment to dislodge compacted material


• Tight schedule: Completion within five days necessitated long shifts and careful planning


Works Completed:


A three-man crew was deployed for the operation, across five days. To meet the removal target, the team used a DISAB


28 | May 2025 | draintraderltd.com


vacuum unit to extract the bulk of the waste, while a VanPack jetting unit with lance was employed to break up compacted sections. A support vehicle with 50 metres of hose ensured reach across the tank as needed.


Karl Creese, business development at McBreen Enviro UK said, “This project is a great example of how McBreen Enviro UK can respond quickly, work efficiently, and deliver on time - even when dealing with complex, high-volume waste removal. Our team’s commitment to safety, sustainability, and quality workmanship continues to set us apart.”


Once levels were lowered, confined space entry was safely undertaken to carry out internal cleaning of the tank’s walls and floor.


Not only was the removal target met, but


the tank was left in a clean and presentable condition.


Full confined space entry procedures were followed during internal cleaning, ensuring a safe working environment for all personnel.


As part of the wider scope of works, suction on the recycler was also used to assist with the emptying of an additional tank on site.


This project demonstrates McBreen Enviro UK’s ability to plan and deliver high-volume waste removal operations under tight deadlines.


Through expert coordination, the team exceeded performance targets, worked safely in challenging conditions, and left the site in excellent condition, highlighting our reliability and commitment to client satisfaction.


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72  |  Page 73  |  Page 74  |  Page 75  |  Page 76  |  Page 77  |  Page 78  |  Page 79  |  Page 80