important to improve the settlement and filtration processes and to optimise biological treatment to ensure the discharged water has a balanced pH. Normally, maturation of the biofilm – which takes 10–12 weeks – can start only when all this is done.
“With these additional assets, dissolved solids have longer to settle and the site can meet the tightened regulatory rules around phosphorous and ammonia.”
Along with the new processes, the expanded site required new pipework, ducting, pumping stations and even footpaths and kerbing. MWH Treatment was supported in this by a host of fellow RSK companies; CR Civil Engineering and Hollywood Civil Engineering managed all civil works, including over 3 km of piping across the site, a 16-way ducting system throughout the whole site for electrical feeds and various formed reinforced concrete works such as footpaths, loading bays, plinths and kiosk bases. Nicholas O’Dwyer handled the design, and RSK Geosciences and Ian Farmer Associates handled ground investigations and geotechnical assessments and services. More than 50 people have been working on the site at any one time over the last 12 months. While the new assets are complete, works on-site are expected to continue until the summer to improve the overall performance of the site, Akram said.
Severn Trent Water spokesperson Sophie Tunnicliff said: “The investment at Burntwood Sewage Treatment Works will ensure that we can comply with the new environmental permit conditions that have been set by the Environment Agency. Increasing primary settlement capacity supports downstream biological treatment processes, improving the performance of our existing biological filters, which are now augmented by the new ammonia removal plant. With the new chemical dosing and tertiary solids removal plant, we will be able to reduce the phosphorous being discharged to the watercourse, giving local people a significantly improved natural environment.”
linkedin.com/company/draintrader
March 2025 |
19
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72 |
Page 73 |
Page 74 |
Page 75 |
Page 76 |
Page 77 |
Page 78 |
Page 79 |
Page 80