THE NEW X-RANGE TABLET
The X-Range pipeline inspection tablet is designed and built for business from the inside out, delivering a reliable operation you can count on. Drop it on tile or concrete fl oors. Use it inside and outside, even in the heat or subzero temperatures. Hose it off. It still works, and if you’re working in even more demanding environments, no problem the rugged boot offers more durability.
Packed with Pipeline inspection software,
including mina + and WinCan ProTouch, you create the reports that suit your needs. Add maps, site images and edit existing reports then share them via Dropbox, WhatsApp or email, it’s that simple. Explore the benefi ts of tablet technology and pipe-line inspection with the X-Range Tablet, site made simple.
Gatwick Airport South Terminal South Term. Gatwick, Horley, RH6 0NP Date
N/A Dry
Time
Weather Location
Depth: 1,1 Distance [m]
Surveyed by Andrei
Pre-cleaning Light Clean
Reference N/A
Section Information Project Name:Gatwick Airport South Terminal
Section 2
Section Number: 2
Start Point Material
mh1
PolyvinylChloride (PVC) Section Use
Pressurised Observation
End Point mh2
Size 100m
Flow Downstream MPEG
Shape Circular
Section Pictures - 08/08/2008 - CP3301X Inspection Direction
PLR Downstream CP3301X
Client`s Job Ref WCE 1234
WinCan Europe Ltd Albert Drive, Woking Tel. 01483 762222
s.peregrine@
wincaneurope.com
Contractor`s Job Ref WO 999
Node 5
Node Pictures - 15/04/2016 - MH2604 Node ID
Alternative ID MH2604
Client's Job Ref WCE 1234
WinCan Europe Ltd Albert Drive, Woking Tel. 01483 762222
s.peregrine@
wincaneurope.com
Contractor's Job Ref WO 999
0.0 0.0 2.0 5.0 9.0 15.0
DRAINAGE SURVEY REPORT Prepared for: GTW Drainage Dept. | Date:
Client Email:
gtw_maintenance@gmail.com 35.0
CREATE MINA REPORTS
39.0 40.0 This report was generated by: Scanprobe Techniques Limited 40.0 Invert Depth: 1,1 01:24 Connections (from 12o'clock to 6o'clock) Crack (from 3o'clock to 1 o'clock) Water Level 3% 01:00 01:13 01:23
2-1-6A, 00:01:57, 12.70 m Crack, longitudinal at 2 o'clock
longitudinal at 2 o'clock 2-1-7A, 00:02:05, 14.80 m Fracture, longitudinal at joint at 3 o'clock
CREATE WINCAN REPORTS
Contractor Email:
service@scanprobe.com Contractor
Tel.No.: 02045051994
Depth: 1,1 Service &OperationalObservations
Structural at
This report was generated usingmina technology |
www.mina.app| Page 1
alDefects al
at
Construction Feat Other Features
at This report was generated usingmina technology |
www.mina.app| Page 5 atures 2-1-8A, 00:02:06, 14.80 m
Position defective, other at 2 o'clock, diameter: 225mm, JN2601
2-1-9A, 00:02:09, 14.80 m Fracture, longitudinal at 4 o'clock 20.0 30.0
Water Level 3% Invert Depth: 1,1 Loss of Vision (full circumference,CD S1) LiningDefect (full circumference,CD S2) Longitudinal Crack from 12o'clock to 7o'clock (CD S3) Finished Continuous Defect (CD F1) Finished Continuous Defect (CD F3) Finished Continuous Defect (CD F2)
00:00 00:00 Cracks, spiral from 1 o'clock to 3 o'clock 00:12 00:22 00:33 00:40 00:46 00:51 Surface damage, spalling at 2 o'clock, At joint 5-1-1A, 0.00 m
General photograph, o’clock direction the photo is taken from, Overview
5-1-1B, 0.00 m
General photograph, o’clock direction the photo is taken from, Overview
WinCan VX Demo Chelsea
11
WinCan VX Demo Chelsea
30
SHARE INSPECTION REPORTS VIA:
Scanprobe Techniques Ltd Unit 11, Kenley Trade Park,
Old Barn Lane, Kenley, Surrey CR8 5AU Tel: 020 3253 2001
SCAN ME
Email:
sales@scanprobe.com
www.scanprobe.com
Page 1 |
Page 2 |
Page 3 |
Page 4 |
Page 5 |
Page 6 |
Page 7 |
Page 8 |
Page 9 |
Page 10 |
Page 11 |
Page 12 |
Page 13 |
Page 14 |
Page 15 |
Page 16 |
Page 17 |
Page 18 |
Page 19 |
Page 20 |
Page 21 |
Page 22 |
Page 23 |
Page 24 |
Page 25 |
Page 26 |
Page 27 |
Page 28 |
Page 29 |
Page 30 |
Page 31 |
Page 32 |
Page 33 |
Page 34 |
Page 35 |
Page 36 |
Page 37 |
Page 38 |
Page 39 |
Page 40 |
Page 41 |
Page 42 |
Page 43 |
Page 44 |
Page 45 |
Page 46 |
Page 47 |
Page 48 |
Page 49 |
Page 50 |
Page 51 |
Page 52 |
Page 53 |
Page 54 |
Page 55 |
Page 56 |
Page 57 |
Page 58 |
Page 59 |
Page 60 |
Page 61 |
Page 62 |
Page 63 |
Page 64 |
Page 65 |
Page 66 |
Page 67 |
Page 68 |
Page 69 |
Page 70 |
Page 71 |
Page 72