search.noResults

search.searching

saml.title
dataCollection.invalidEmail
note.createNoteMessage

search.noResults

search.searching

orderForm.title

orderForm.productCode
orderForm.description
orderForm.quantity
orderForm.itemPrice
orderForm.price
orderForm.totalPrice
orderForm.deliveryDetails.billingAddress
orderForm.deliveryDetails.deliveryAddress
orderForm.noItems
SPECIAL WORKS


“Our professional teams have vast experience in reacting quickly and effectively to get everything back on track, ensuring minimal disruption.”


The ISAS accreditation scheme was launched to establish industry benchmarks and raise standards.


CSG’s processes were examined and audited in order to achieve the accreditation.


Arriving within the hour, CSG can respond to hazardous oil and chemical spills and non- hazardous spills with its fleet of specialist vehicles. All vehicles carry on-board spill kits,


absorbents and specialist equipment to contain and clean up the spill and prevent contamination of the environment.


Mike said it is important that businesses dealing with wastewater, chemicals and oils have a proper spills procedure in place in preparation for the worst.


“Businesses just don’t think it will happen so they fail to prepare for spills,” he said. “I’d estimate only around five per cent of businesses are properly prepared for an incident.


“Spills can be extremely expensive to deal


with and they can also harm employees, increase insurance premiums and destroy reputations.”


Mike said well-prepared businesses have spill protocols in place, as well having spill kits on site including absorbents and cones.


Most importantly of all, Mike said, employees need to be adequately trained.


“Well-prepared businesses will train their staff on how to control spills and how to react in a safe and effective manner,” he said. “Panic can often set in when a spill occurs and that can make it worse.”


Hybrid-SAF Technology selected for sensitive Scottish site


Technology from wastewater treatment specialist WCS Environmental Engineering (WCSEE) has been selected by Scottish Water to deliver a tightened ammonia removal consent at a village treatment works. The updated consent has led the public utility to upgrade Edgehead wastewater treatment works (WwTW) in Midlothian, east of Edinburgh.


The upgrade will involve the delivery and installation of two in-ground Hybrid-SAFs (submerged aerated filters) and a 4m conical humus tank. Due to the environmental sensitivity of the site, the Scottish Environmental Protection Agency has set an effluent ammonia level of


Example of submerged Hybrid SAF units at a WwTW


1.3mg/l of water, with a bio-chemical oxygen demand of 13.9mg/litre.


Additionally, the site has a tight footprint and is in close proximity to residential housing, both important factors considered early in the project when initial enquiries were made with WCSEE in 2017.


WCSEE utility manager Andrew Haywood said, “The Hybrid-SAF has a modular design and 30% smaller footprint over comparable technologies, which makes it versatile and flexible for deployment in Edgehead. Installing the technology below ground ensures the stunning rural views go uninterrupted, and the visual impact of the WwTW is reduced, blending with the environment as much as


possible.”


The patented Hybrid-SAF™ technology employs a submerged moving-bed and fixed-film reactor, proven to treat wastewater with greater energy efficiency than traditional submerged SAFs. The unique flow balancing design in the primary tank means it can handle variable flows and loads, making it ideal for seasonal and variable demands.


Hybrid-SAF treatment units are built offsite in controlled conditions and easily transported to site, ready for installation. They can be moved between locations as needs and requirements change – minimising onsite disruption, reducing waste, and optimising site footprint.


WCSEE has a longstanding relationship with Scottish Water, and augmentation and improvement of the Edgehead WwTW is part of Scottish Water’s long-term water planning strategy, with the Hybrid-SAFs due to be installed in early 2024.


Haywood said, “It is great to be able to work with Scottish Water again and see the process through from initial enquiry to installation. WCSEE has been delivering projects for the utility over 10 years and the company is proud to be trusted to deliver such a tight ammonia consent.”


Within two weeks of installation, as the biological process becomes fully operational, the two Hybrid-SAF units will be able to handle flow rates up to 2.72 l/sec with average flows of 0.35 l/sec.


20 | February 2024 | www.draintraderltd.com


Page 1  |  Page 2  |  Page 3  |  Page 4  |  Page 5  |  Page 6  |  Page 7  |  Page 8  |  Page 9  |  Page 10  |  Page 11  |  Page 12  |  Page 13  |  Page 14  |  Page 15  |  Page 16  |  Page 17  |  Page 18  |  Page 19  |  Page 20  |  Page 21  |  Page 22  |  Page 23  |  Page 24  |  Page 25  |  Page 26  |  Page 27  |  Page 28  |  Page 29  |  Page 30  |  Page 31  |  Page 32  |  Page 33  |  Page 34  |  Page 35  |  Page 36  |  Page 37  |  Page 38  |  Page 39  |  Page 40  |  Page 41  |  Page 42  |  Page 43  |  Page 44  |  Page 45  |  Page 46  |  Page 47  |  Page 48  |  Page 49  |  Page 50  |  Page 51  |  Page 52  |  Page 53  |  Page 54  |  Page 55  |  Page 56  |  Page 57  |  Page 58  |  Page 59  |  Page 60  |  Page 61  |  Page 62  |  Page 63  |  Page 64  |  Page 65  |  Page 66  |  Page 67  |  Page 68  |  Page 69  |  Page 70  |  Page 71  |  Page 72